BLD-Final | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 11:28:21. Contact: .\\c\c #18440
|
BLD-Final | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 15:29:53. Contact: . Disp set to [CANC] by a contractor via Hello! on 06/09/2000 at 11:27:07.
|
BLD-Energy code compliance | 4/18/2000 | 4/19/2000 | 4/19/2000 | P | PASS |
Jim Sly
|
|
|
###-####-varriale--energy code Frame pass 4/20/00 8:24:23 AM
|
BLD-Framing/Rough-in | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/13/2000 at 14:56:02. Contact: . C/N...truss corrections. 4/14/00 1:41:46 PM
|
BLD-Framing/Rough-in | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | PART |
Jim Sly
|
|
|
tony ###-#### r/i Shear ok 4/3/00 1:36:38 PM
|
BLD-Foundation | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | PASS |
Jim Sly
|
|
|
###-#### logan
|
BLD-Footing | 2/13/2000 | 2/14/2000 | 2/14/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/13/2000 at 10:02:56. Contact: . footings appear ok. 2/14/00 2:21:40 PM
|