Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-00269
StatusFinaled
Name L B INDUSTRIES INC
Site Address 1010 S ALLANTE PL
Project NameR T NAHAS BLDG
Customer Number 
ePlanReviewNo
Description
R. T. NAHAS OFFICE BUILDING * TO CONSTRUCT A NEW 10,520 SQ. FT., ONE STORY WOOD FRAMED OFFICE BUILDING WITH A 1550 SQ. FT. BASEMENT. 7120 SQ. FT. OF THE FIRST FLOOR AND THE BASEMENT WILL BE FINISHED UNDER THIS PERMIT. 3400 SQ. FT. OF THE FIRST FLOOR WILL BE FINISHED UNDER SEPARATE TENANT IMPROVEMENT PERMITS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#091-00/DRH99-00155 - GRADING PERMIT BLD00-00283 - JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 10/18/200010/18/2000 DONE
Details
BLD-Final10/12/200010/13/200010/13/2000PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/12/2000 at 16:11:30. Contact: ###-####.card to contractor. 10/13/2000 4:11:38 PM
BLD-Final10/11/200010/12/200010/12/2000PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/11/2000 at 15:47:53. Contact: ###-####.
FIRE-Final Inspection10/11/200010/12/200010/12/2000PPASS
DetailsJoe Tawney
###-####. 10/12/2000 8:32:47 AM Reinsp OK for permanant occupancy 10/13/2000 7:51:11 AM
BLD-Conference10/11/200010/11/200010/11/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/11/2000
BLD-Conference10/6/200010/6/200010/6/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/6/2000 stair ok per325
BLD-Conference10/5/200010/5/200010/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2000 re c/n, cited 1003 exc for private stairs, will consult 325
BLD-Conference10/5/200010/5/200010/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2000
BLD-Conference10/5/200010/5/200010/5/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2000
BLD-Conference9/29/200010/2/200010/2/2000APASS
DetailsCarl Dependahl
10/2/2000 10:20:38 AM w/ bldr re demising wall. will advise after chk w/mgmt. 10/2/2000 10:21:39 AM
BLD-Final10/2/200010/2/200010/2/2000AFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 10/2/2000 c/n issued, need other sig's, stairs, rails, finish, etc.
FIRE-Final Inspection9/28/20009/29/20009/29/2000AFAIL
DetailsJoe Tawney
Final Fail C/N issued. 10/2/2000 7:55:14 AM
FIRE-Conference9/22/20009/22/20009/22/2000PPART
DetailsJoe Tawney
###-#### scott Conf on fire code items for final insp 9/25/2000 7:42:12 AM
BLD-Conference9/13/20009/13/20009/13/2000PPASS
DetailsCarl Dependahl
scott-- ###-#### conf insp; re prev c/n...show specs for grid, add spacer bars, etc. status of demising wall unclear for elec panels. 9/13/2000 11:34:03 AM
BLD-Framing/Rough-in9/11/20009/11/20009/11/2000PFAIL
Details
CEILING GRID -SCOTT ###-#### need better wire wrapping need pop riviting need to complete perimeter slack wiring and install all light fixtures, elec panel box in tenant demising wall too large of an opening c/nissued 9/11/2000 4:21:17 PM
BLD-Wall cover8/15/20008/16/20008/16/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/15/2000 at 16:09:52. Contact: .bath rm, draft stops ok 8/16/2000 12:11:24 PM
BLD-Wall cover8/14/20008/15/20008/15/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/14/2000 at 15:32:24. Contact: . Int parts ok 8/15/2000 4:22:43 PM
BLD-Wall cover8/14/20008/14/20008/14/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/14/2000 at 08:06:51. Contact: .recall when complete 8/14/2000 4:42:40 PM
BLD-Conference7/18/20007/18/20007/18/2000PPASS
DetailsCarl Dependahl
###-#### Will submit info re: tile @ rest rm. glazed? 7/19/00 9:59:47 AM
BLD-Framing/Rough-in7/11/20007/12/20007/12/2000PPART
DetailsCarl Dependahl
###-#### Bsmt. lid, ext. wall frame/nailing ok ok to insul. 7/13/00 11:32:17 AM
BLD-Framing/Rough-in7/6/20007/7/20007/7/2000AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/06/2000 at 07:57:59. Contact: . Need clarify int. shearwall. 7/10/00 10:29:06 AM
BLD-Framing/Rough-in6/28/20006/29/20006/29/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/28/2000 at 09:52:20. Contact: ###-####. roof nailing 6/30/00 8:14:24 AM
BLD-Other6/28/20006/29/20006/28/2000ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/28/2000 at 09:18:14. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/28/2000 at 09:50:34.
BLD-Framing/Rough-in6/28/20006/28/20006/28/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/28/2000 at 10:08:36. Contact: ###-####. recall n/r 6/29/00 10:01:16 AM
BLD-Footing5/9/20005/10/20005/10/2000APART
DetailsCarl Dependahl
scott ###-#### ft SW corner ftgs. 5/11/00 11:48:43 AM
BLD-Footing5/8/20005/9/20005/9/2000PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/08/2000 at 16:10:25. Contact: . cancel =re-schdeuled No plan available, trailer locked. 5/11/00 10:57:08 AM
BLD-Foundation4/24/20004/25/20004/26/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/24/2000 at 08:47:08. Contact: . late pm Scott ###-#### West fdn. wall(s) ok 4/28/00 8:36:59 AM
BLD-Foundation4/19/20004/20/20004/20/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/19/2000 at 11:50:42. Contact: . North & west side ftg's. ok; verts ok. 4/21/00 9:26:01 AM
BLD-Foundation4/18/20004/19/20004/19/2000APART
DetailsCarl Dependahl
###-#### Bsmt. wall....eng's approval for beam pockets to follow. 4/19/00 1:52:58 PM
BLD-Footing4/12/20004/12/20004/12/2000PPART
DetailsCarl Dependahl
basment footings last thing this afternoon Scott ###-#### Basement ftg's only. No spec. insp., 2500 PSI design. 4/17/00 1:32:09 PM