BLD-Concrete | 9/5/2000 | 9/5/2000 | 9/5/2000 | P | CANC |
Russ Owen
|
|
|
Added by Inspector: 407 On 9/5/2000 wrong inspection. 9/6/2000 8:48:26 AM
|
BLD-Final | 9/6/2000 | 9/5/2000 | 9/5/2000 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 9/6/2000 drainage repaired.
|
BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | A | FAIL |
Russ Owen
|
|
|
dwayne ###-#### Grade away 2% required away from foundation. Crawl vapor coverage.a9/1/2000 11:26:01 AM 9/1/2000 11:26:26 AM
|
BLD-Final | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | NR |
Tom Arcoraci
|
|
|
###-####
|
BLD-Energy code compliance | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | PASS |
Russ Owen
|
|
|
|
BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### C/N posted 4/21/00 9:28:21 AM
|
BLD-Framing/Rough-in | 3/31/2000 | 4/3/2000 | 4/3/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Shear; ok to side. 4/3/00 1:37:26 PM
|
BLD-Foundation | 2/21/2000 | 2/22/2000 | 2/22/2000 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/21/2000 at 15:27:35. Contact: ###-####. Needs (2) #4 bars top and bottom, called contractor. 2/23/00 1:55:04 PM
|
BLD-Footing | 2/18/2000 | 2/18/2000 | 2/18/2000 | P | PASS |
Carl Dependahl
|
|
|
###-#### Ftg. ok. 2/23/00 11:04:08 AM
|