BLD-Final | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Jim Sly
|
|
|
###-#### call first\\needs as early as possible
|
BLD-Final | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 08:02:11. Contact: ###-####. fn insp Done by 301 7/26/00 8:57:16 AM
|
BLD-Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | A | FAIL |
Jim Storey
|
|
|
Added by Inspector: 301 On 7/26/2000 c/n instal foundation vent and cut grade away from vent / seal exterior piping penatrations / seal recps and canlight gaskets.
|
BLD-Energy code compliance | 4/6/2000 | 4/10/2000 | 4/10/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 14:45:50. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 14:44:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 14:34:15. Contact: ###-####. Shear ok 3/22/00 1:00:10 PM
|
BLD-Footing | 3/2/2000 | 3/3/2000 | 3/3/2000 | P | PART |
Jim Sly
|
|
|
###-#### jason Footing appears ok. 3/6/00 11:16:12 AM
|