BLD-Final | 6/16/2000 | 6/19/2000 | 6/19/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 13:17:48. Contact: .
|
BLD-Final | 6/15/2000 | 6/15/2000 | 6/15/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/15/2000 at 07:43:22. Contact: .
|
BLD-Final | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/09/2000 at 14:43:54. Contact: .
|
BLD-Other | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/20/2000 at 12:37:08. Contact: . Engineer has approved rear garage wall. 4/21/00 1:52:06 PM
|
BLD-Framing/Rough-in | 4/6/2000 | 4/6/2000 | 4/11/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/06/2000 at 10:44:09. Contact: . All ok, just need clarification from Briggs for 2 windows noted by plan review. 4/7/00 12:31:27 PM
|
BLD-Energy code compliance | 4/11/2000 | 4/11/2000 | 4/11/2000 | A | PART |
Russ Owen
|
|
|
Note,engineer has approved rear house rear wall, ok to sheetrock house waiting for engineers approval for rear garage door.I meet with contractor this morning 407.
|
BLD-Wall cover | 4/7/2000 | 4/10/2000 | 4/10/2000 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 15:52:19. Contact: . Still waiting for clarification from Briggs. 4/11/00 10:46:58 AM
|
BLD-Wall cover | 4/7/2000 | 4/7/2000 | 4/7/2000 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/07/2000 at 09:28:25. Contact: . Not ready 4/11/00 9:37:50 AM
|
BLD-Other | 3/21/2000 | 3/22/2000 | 3/22/2000 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/21/2000 at 11:35:15. Contact: . HD missing; ok to side. 3/22/00 1:07:01 PM
|
BLD-Foundation | 3/2/2000 | 3/2/2000 | 3/2/2000 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 08:45:00. Contact: ###-####. Poured w/o inspection- no string lines or property pius placed. 3/6/00 10:44:28 AM
|
BLD-Footing | 3/1/2000 | 3/1/2000 | 3/1/2000 | P | FAIL |
Wes Worcester
|
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 09:10:41. Contact: . No approved plan on site, boards laying on dirt & no rebar in place. Unable to check setbacks- (no lines or pins). 3/2/00 8:47:52 AM
|