BLD-Final | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PASS |
Jim Storey
|
|
|
JEFF ###-#### FN OCC
|
BLD-Final | 7/11/2000 | 7/12/2000 | 7/12/2000 | A | PASS |
Jim Storey
|
|
|
JEFF ###-#### FN OCC
|
BLD-Final | 7/10/2000 | 7/11/2000 | 7/11/2000 | A | FAIL |
Jim Storey
|
|
|
Jeff ###-#### c/n posted. 7/11/00 2:15:30 PM
|
BLD-Final | 7/7/2000 | 7/10/2000 | 7/10/2000 | A | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/23/2000 | 6/26/2000 | 6/26/2000 | A | PART |
Jim Storey
|
|
|
jeff-- ###-#### fr insp interior walls at bathroom and closet behind stair requir bearing to footing thru floor systeim. ok to be checked at final. c/n to be on site at final insp... 6/26/00 10:29:05 AM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/22/2000 | 6/22/2000 | 6/22/2000 | P | FAIL |
Jim Storey
|
|
|
shear insp RC ###-####
|
BLD-Energy code compliance | 6/15/2000 | 6/19/2000 | 6/19/2000 | P | NR |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 6/15/2000 | 6/16/2000 | 6/16/2000 | A | FAIL |
Jim Storey
|
|
|
###-#### void pluming and mech. i joist to be repaired with details from supplier. 6/16/00 2:46:38 PM
|
BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 | P | PART |
Jim Storey
|
|
|
shear insp Ryan ###-####
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | PART |
Jim Storey
|
|
|
Ryan ###-####
|
BLD-Footing | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
|
|
|
setbacks appear ok 5/12/00 10:18:02 AM
|
BLD-Foundation | 5/11/2000 | 5/12/2000 | 5/12/2000 | A | PASS |
|
|
|
###-#### r-bar placed 5/12/00 10:17:49 AM
|