BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | PASS |
Alan Hauser
|
|
|
c/c#19848 12/22/2000 11:57:36 AM
|
BLD-Energy code compliance | 6/23/2000 | 6/27/2000 | 6/27/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 06/23/2000 at 08:34:53. Contact: . made ok to cover 6/30/00 10:04:06 AM
|
BLD-Energy code compliance | 6/21/2000 | 6/22/2000 | 6/22/2000 | P | PASS |
|
|
|
Scheduled by a contractor via Hello! on 06/21/2000 at 12:17:52. Contact: . ok to cover; to remove vapor barrier from behind greenboard on ext walls 6/23/00 3:07:32 PM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 | A | PASS |
Jim Storey
|
|
|
Scheduled by Inspector: 338 On 6/19/00
|
BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PART |
|
|
|
###-#### ned eng and add to the permit for added patio area 6/19/00 3:14:31 PM
|
BLD-Framing/Rough-in | 6/16/2000 | 6/16/2000 | 6/16/2000 | P | CANC |
|
|
|
###-#### out tof time 6/19/00 6:51:46 AM
|
BLD-Framing/Rough-in | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | PART |
Jim Storey
|
|
|
shear wall Bob ###-#### sheer ok 6/12/00 1:37:02 PM
|
BLD-Framing/Rough-in | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | PART |
|
|
|
###-#### for far nrth valt end wall ok to install int shear...also need to researchaccess required for small loft between two west bedrooms 5/10/00 4:09:37 PM
|
BLD-Footing | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 11:59:58. Contact: ###-####. walls for the south and west areas 04/17/2000
|
BLD-Footing | 4/13/2000 | 4/13/2000 | 4/13/2000 | P | PART |
|
|
|
###-#### or ###-#### made okfor the south side front to back all r-bar is placed 04/14/2000
|
BLD-Foundation | 4/4/2000 | 4/5/2000 | 4/5/2000 | A | PASS |
Jim Storey
|
|
|
###-#### walls ok 4/5/00
|
BLD-Footing | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PART |
Jim Storey
|
|
|
Bob Gallagher ###-#### north west ft ok 4/3/00
|