BLD-Final | 8/4/2000 | 8/7/2000 | 8/7/2000 | A | PASS |
Carl Dependahl
|
|
|
###-####; card to cont. 8/7/2000 11:20:03 AM
|
Permanent Occupancy | | 8/7/2000 | 8/7/2000 | | DONE |
|
|
|
|
BLD-Final | 7/27/2000 | 8/1/2000 | 8/1/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### nick; c/n, stairs, rails at ext. exit signs 8/1/2000 10:09:13 AM
|
FIRE-Final Inspection | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/26/2000 at 13:59:30. Contact: . Reinsp. ok for perm. occ. 7/27/00 1:54:13 PM
|
FIRE-Final Inspection | 7/21/2000 | 7/24/2000 | 7/24/2000 | A | FAIL |
Joe Tawney
|
|
|
Mic ###-#### Final fail C/N issued 7/24/00 1:22:15 PM
|
BLD-Framing/Rough-in | 6/13/2000 | 6/14/2000 | 6/14/2000 | A | PASS |
Tom Arcoraci
|
|
|
mic ###-####
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PART |
Jim Sly
|
|
|
###-#### Ok to cover- prev. corr. completed except. c/N need spec. insp/approval on welding S.W. column 2nd floor. 6/13/00 11:52:57 AM
|
BLD-Framing/Rough-in | 6/6/2000 | 6/6/2000 | 6/6/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### C/N- frame details. 6/19/00 11:10:44 AM
|
BLD-Footing | 4/27/2000 | 5/1/2000 | 5/1/2000 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 17:21:24. Contact: ###-####. Ftg's for mezzanine ok....wrap pipes per plbg. insp.
|
BLD-Footing | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 17:09:59. Contact: ###-####. N/R, recall. Need eng's ok & spec. insp. for steel framework/welding. 4/28/00 3:05:05 PM
|