BLD-Final | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by Inspector: 420 On 5/4/2001 1:06:06 PM
|
BLD-Final | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | FAIL |
Dave Hannah
|
|
|
Shane, ###-#### - garage code #5296 enter c/n on site 5/3/2001 11:48:47 AM
|
BLD-Energy code compliance | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | PASS |
Russ Owen
|
|
|
shane ###-####
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PASS |
Russ Owen
|
|
|
Shane ###-#### need to recall energy code 6/13/00 9:59:33 AM
|
BLD-Framing/Rough-in | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | FAIL |
Russ Owen
|
|
|
shane ###-#### 2 c/n's from prior . left to finish
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | NR |
Russ Owen
|
|
|
SHANE; ###-#### Need truss calcs. for frame insp. C/N poste 6/1/00 11:28:22 AM
|
BLD-Framing/Rough-in | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Tom Arcoraci
|
|
|
Shane ###-#### shear nail Ok to side all of house. 5/30/00 9:51:40 AM
|
BLD-Framing/Rough-in | 5/3/2000 | 5/4/2000 | 5/4/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### c/N posted fireplace shearwall. 5/4/00 4:56:10 PM
|
BLD-Framing/Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | NR |
Russ Owen
|
|
|
sheer wall insp Shane ###-#### Called me and cancelled. 4/28/00 12:06:08 PM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Engineering not done cancel. 4/26/00 12:13:00 PM
|
BLD-Framing/Rough-in | 4/21/2000 | 4/21/2000 | 4/21/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Still waiting for engineering. 4/24/00 9:18:49 AM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Still waiting for engineering for rear. 4/21/00 9:28:41 AM
|
BLD-Framing/Rough-in | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### Rear wall not per engineering 4/20/00 1:23:54 PM
|
BLD-Framing/Rough-in | 4/17/2000 | 4/18/2000 | 4/18/2000 | P | NR |
Russ Owen
|
|
|
###-#### Recall when ready, went over requirements with framer. 4/19/00 9:56:38 AM
|
BLD-Foundation | 3/14/2000 | 3/15/2000 | 3/15/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/14/2000 at 14:08:09. Contact: ###-####. Walls 3/16/00 1:43:51 PM
|
BLD-Footing | 3/13/2000 | 3/14/2000 | 3/14/2000 | A | FAIL |
Wes Worcester
|
|
|
###-#### Not ready- No bds., rebar, etc. 3/14/00 1:59:31 PM
|
BLD-Foundation | 3/14/2000 | 3/14/2000 | 3/14/2000 | P | PASS |
Wes Worcester
|
|
|
###-####
|