BLD-Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-#### L/C issued. 7/7/00 1:48:50 PM
|
BLD-Framing/Rough-in | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### NR
|
BLD-Framing/Rough-in | 4/27/2000 | 4/28/2000 | 4/28/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N issued. 4/28/00 12:33:42 PM
|
BLD-Framing/Rough-in | 4/27/2000 | 4/27/2000 | 4/27/2000 | A | CANC |
Jim Sly
|
|
|
Called contr. left message.
|
BLD-Conference | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | PART |
Jim Sly
|
|
|
###-#### Conf. framing. 4/19/00 1:40:47 PM
|
BLD-Framing/Rough-in | 4/12/2000 | 4/13/2000 | 4/13/2000 | A | PART |
Jim Sly
|
|
|
troy ###-#### shear wall insp Shear ok 4/13/00 1:06:35 PM
|
BLD-Conference | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | PART |
Jim Sly
|
|
|
Roger, ###-#### : ) Conf. stairs & cantilevers 4/4/00 9:37:07 AM
|
BLD-Foundation | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 3/17/2000 | 3/17/2000 | 3/17/2000 | P | PART |
Jim Sly
|
|
|
early pm ###-#### Footing appears ok. 3/20/00 10:20:59 AM
|
BLD-Footing | 3/16/2000 | 3/16/2000 | 3/16/2000 | P | FAIL |
Jim Sly
|
|
|
randy ###-#### N/R 3/17/00 10:35:48 AM
|