Permanent Occupancy | | 8/8/2000 | 8/8/2000 | | DONE |
|
|
|
|
BLD-Final | 6/19/2000 | 6/19/2000 | 6/19/2000 | A | PASS |
|
|
|
Scheduled by Inspector: 338 On 6/19/00 made ok for sign off 6/19/00 1:48:33 PM
|
BLD-Final | 6/16/2000 | 6/16/2000 | 6/16/2000 | P | CANC |
|
|
|
###-#### out of time 6/19/00 6:44:08 AM
|
BLD-Final | 5/6/2000 | 5/8/2000 | 5/8/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/06/2000 at 11:00:35. Contact: ###-####. c/n issuec 409 c/n not complete rated door to the exit hall, occupied w/o approvals 5/8/00 9:50:46 AM
|
BLD-Final | 5/4/2000 | 5/5/2000 | 5/5/2000 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:41:08. Contact: ###-####. no access to bldg . 5/5/00 4:44:15 PM
|
FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:37:56. Contact: ###-####.
|
BLD-Final | 5/1/2000 | 5/2/2000 | 5/2/2000 | A | FAIL |
|
|
|
Scheduled by Inspector: 338 On 5/1/00 ###-#### 5/1/00 3:17:40 PM this building permit and plans call for fully sprinklered building 5/2/00 4:02:25 PM
|
FIRE-Final Inspection | 4/28/2000 | 5/2/2000 | 5/2/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/28/2000 at 08:39:09. Contact: ###-####. Not sprinklered; extinguisher; rated door at corridor.
|
BLD-Final | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 05/01/2000 at 08:16:16. Contact: ###-####. CANCELLED BY THE CONTRACTOR 5/1/00 3:17:11 PM
|
BLD-Framing/Rough-in | 4/14/2000 | 4/17/2000 | 4/17/2000 | A | PART |
|
|
|
Scheduled by a contractor via Hello! on 04/14/2000 at 12:18:22. Contact: ###-####. ok to cover all but the plumbed walls 04/17/2000
|