BLD-Final | 8/6/2001 | 8/6/2001 | 8/6/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 08:24:25. Contact: ###-####. ok for perm occ 8/6/2001 3:28:17 AM
|
BLD-Final | 7/13/2001 | 7/16/2001 | 7/16/2001 | P | NR |
Tom Arcoraci
|
|
|
lee ###-#### fn occ NEEDS TO RAISE SINK 7/16/2001 10:16:49 PM
|
FIRE-Final Inspection | 7/13/2001 | 7/16/2001 | 7/16/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 7/16/2001 1:28:06 PM
|
FIRE-Final Inspection | 1/22/2001 | 1/23/2001 | 1/23/2001 | A | FAIL |
Joe Tawney
|
|
|
Bill tonkin ###-#### Final Fail C/N issued 1/23/2001 12:12:57 PM
|
BLD-Final | 1/22/2001 | 1/22/2001 | 1/22/2001 | P | NR |
Tom Arcoraci
|
|
|
###-#### will recall 1/22/2001 2:27:51 PM
|
BLD-Framing/Rough-in | 6/13/2000 | 6/14/2000 | 6/14/2000 | A | PART |
Tom Arcoraci
|
|
|
###-####\\ceiling Grid only ok 6/15/00 11:33:24 AM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | FAIL |
Jim Sly
|
|
|
ceiling grid ###-#### NR 6/13/00 2:42:04 PM
|