BLD-Final | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PASS |
|
|
|
Scheduled by Inspector: 338 On 04/12/2000 made ok c/n c/n removed ok for certs and occ 04/12/2000
|
BLD-Final | 4/5/2000 | 4/5/2000 | 4/5/2000 | P | CANC |
Jim Storey
|
|
|
###-#### computer data lost check job for actual results. 4/6/00
|
BLD-Final | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
|
|
|
###-#### 97 ubc# 1003.3.1.8 locks and latches interior exit door 04/03/2000
|
BLD-Framing/Rough-in | 3/10/2000 | 3/13/2000 | 3/13/2000 | A | PASS |
Wes Worcester
|
|
|
craig ###-#### 2nd & 3rd floor wall framing ok 3/24/00 1:57:49 PM
|
BLD-Framing/Rough-in | 3/8/2000 | 3/9/2000 | 3/9/2000 | A | FAIL |
|
|
|
###-#### c/n issued need ele rough signoff prior to call for framing rough. thumb turn to be removed prior to the final signoff 3/9/00 10:21:02 AM
|