BLD-Final | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PASS |
|
|
|
Radio Shack okt o signcard perm col 7/28/2000 6:39:31 AM
|
Permanent Occupancy | | 7/28/2000 | 7/28/2000 | | DONE |
|
|
|
|
BLD-Final | 4/28/2000 | 5/1/2000 | 5/1/2000 | A | PART |
|
|
|
###-#### PLANS STILL DO NOT MATCH THE WORK DONE, OK FOER TEMP ONLY 5/1/00 11:28:41 AM
|
FIRE-Final Inspection | 4/28/2000 | 5/1/2000 | 5/1/2000 | A | PASS |
Joe Tawney
|
|
|
###-#### Reinsp ok for perm. occ. 5/1/00 3:42:37 PM
|
BLD-Framing/Rough-in | 4/28/2000 | 4/28/2000 | 4/28/2000 | P | PASS |
Jim Storey
|
|
|
DUSTIN ###-#### FR
|
FIRE-Final Inspection | 4/26/2000 | 4/27/2000 | 4/27/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp. fail C/N items not all corrected. 4/28/00 9:02:04 AM
|
BLD-Conference | 4/24/2000 | 4/25/2000 | 4/25/2000 | A | FAIL |
|
|
|
###-#### dustin call first to meet there approved plans requied to match the work in progess 4/25/00 10:15:29 AM
|
BLD-Conference | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Tom Arcoraci
|
|
|
structural inspectors ###-#### Dustin Not per plan. 4/26/00 12:08:06 PM
|
FIRE-Final Inspection | 4/14/2000 | 4/14/2000 | 4/14/2000 | P | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp./conference sprinkler protection above ceiling grid. 4/17/00 9:26:54 AM
|
FIRE-Final Inspection | 4/11/2000 | 4/12/2000 | 4/12/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final fail C/N issued. 4/13/00 8:52:11 AM
|
BLD-Framing/Rough-in | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PART |
|
|
|
###-#### ok to cover new walls only 04/04/2000
|
BLD-Framing/Rough-in | 4/3/2000 | 4/3/2000 | 4/3/2000 | P | FAIL |
|
|
|
###-#### cancelled by the contractor 04/03/2000
|
BLD-Framing/Rough-in | 3/30/2000 | 3/31/2000 | 3/31/2000 | A | NR |
Russ Owen
|
|
|
###-#### needs ele. & plm\ 3/31/00 4:35:55 PM
|