BLD-Final | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 08:48:34. Contact: ###-####. Energy pass 5/18/00 3:09:35 PM
|
BLD-Framing/Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/16/2000 at 07:42:00. Contact: ###-####. C/N issued.
|
BLD-Wall cover | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 08:23:40. Contact: ###-####. Shear ok 5/8/00 9:09:37 AM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 07:01:27. Contact: ###-####. TJI eng. to advise- transfer shear through TJI rim 5/4/00 4:57:28 PM
|
BLD-Footing | 3/20/2000 | 3/20/2000 | 3/20/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Early start, rebar in place, foot appears ok. 3/21/00 9:30:24 AM
|