BLD-Final | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 12:07:26. Contact: ###-####. C. of C #21413 issued. 3/27/2001 9:08:24 AM
|
BLD-Final | 3/23/2001 | 3/26/2001 | 3/26/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/23/2001 at 16:10:34. Contact: ###-####. c/n posted 3/26/2001 10:41:12 AM
|
BLD-Conference | 3/23/2001 | 3/23/2001 | 3/23/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/23/2001 12:22:30 PM plans lost...ok
|
BLD-Final | 3/22/2001 | 3/22/2001 | 3/22/2001 | P | FAIL |
Carl Dependahl
|
|
|
gar door code is 2292--###-####- kent fn occ c/n air seal, plans 3/22/2001 4:42:49 PM
|
BLD-Energy code compliance | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
Russ Owen
|
|
|
###-#### kent
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 07:28:06. Contact: ###-####. Needs electrical 4/24/00 1:06:58 PM
|
BLD-Framing/Rough-in | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/24/2000 at 10:34:48. Contact: ###-####. C/N posted note: engineering has been resolved and is attached to plans for rear wall. 4/26/00 12:13:30 PM
|
BLD-Framing/Rough-in | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | CANC |
Russ Owen
|
|
|
###-####\\shear wall Trans to 301 4/11/00 10:46:22 AM
|
BLD-Framing/Rough-in | 4/10/2000 | 4/10/2000 | 4/10/2000 | P | PART |
Jim Storey
|
|
|
Added by Inspector: 301 On 4/10/00 need engineering to justify no hold downs in back of house.
|
BLD-Foundation | 3/22/2000 | 3/22/2000 | 3/22/2000 | P | PART |
Wes Worcester
|
|
|
8612222 Incomplete- still placing hold downs rebar appears ok. 3/22/00 1:48:17 PM
|
BLD-Footing | 3/21/2000 | 3/21/2000 | 3/21/2000 | P | PASS |
Jim Storey
|
|
|
###-#### late pm 3pm jim, from yesterday ft ok 3/22/00 9:04:34 AM
|