Permit Information
Permit NumberBLD00-00660
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #25-SHOP 25-20003168
Customer Number252000316
ePlanReviewNo
Description
MICRON TECHNOLOGY - BUILDING 25 - SHOP EXPANSION (25-20003168) - TO RELOCATE A DOOR AT GRID LINE 16, ADD CEILING GRID AND INSTALL NEW SOUND INSULATED WALLS AT THE FIRST FLOOR INSTRUMENTATION SHOP 102L; AND TO FINISH THE SECOND LEVEL MEZZANINE AREA (1150 SQ. FT.) TO CREATE A NEW BULLPEN AREA, RESTROOM, COMMUNCATIONS ROOM AND CONFERENCE ROOM. THIS WORK IS BEING DONE WITHIN BUILDING 25 BETWEEN GRID LINES 16&18 AND D4&F. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. PC#187-00/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/12/20033/13/20033/13/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/12/2003 at 10:56:35 AM. Contact: ###-####.
BLD-Aging Inspection2/17/20032/17/20032/17/2003 PART
DetailsJim Storey
final will be this week wyane berry micron. 2/18/2003 8:19:12 AM
BLD-Conference11/23/200111/26/200111/26/2001AFAIL
DetailsJim Storey
Scheduled by Inspector: 301 On 11/23/2001 2:52:12 PM need returns to wall at handrail termations. 11/26/2001 11:46:09 AM
BLD-Final11/21/200111/23/200111/23/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/21/2001 at 10:45:26. Contact: ###-####.
FIRE-Final Inspection11/16/200111/20/200111/20/2001APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/16/2001 at 11:54:48. Contact: ###-####.
BLD-Other9/29/20009/29/20009/29/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/29/2000 at 09:54:45. Contact: ###-####. framing and ceilling ok 9/29/2000 4:27:26 PM