Permit Information
Permit NumberBLD00-00668
StatusFinaled
Name HARTWOOD CONDOMINIUMS
Site Address 5658 N BLOOM ST
Project NameHARTWOOD CONDOMINIUM
Customer Number 
ePlanReviewNo
Description
BUILDING #2 * TO CONSTRUCT A NEW, TWO STORY, WOOD FRAMED, TYPE V NONRATED, 3,694 SQ.FT. FOUR PLEX, CONDOMINUIM UNIT, WITH TWO TYPE "A" UNITS AND TWO TYPE "B" UNITS. THE TYPE "A" UNIT IS TWO STORY, TWO BEDROOMS AND TWO BATHS, AT 614 SQ.FT. DOWN AND 346 SQ.FT. UP. THE "B" UNIT IS TWO STORY, TWO BEDROOMS AND ONE AND ONE-HALF BATHS AT 468 SQ.FT. DOWN AND 419 SQ.FT. UP. ALL WORK PER THE APPROVED PLANS, ATTACHED COMMENT LIST, AND THE 1997 EDITION OF THE UBC. ADDITIONAL WORK INCLUDED IN THIS PERMIT IS ON SITE LAND SCAPING AND RELATED PAVED PARKING. CUP 98-00011 DRH 98-00010 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/13/20033/14/20033/14/2003APASS
DetailsTom Arcoraci
Earl, ###-#### - please call 1st so he can let you in ok for perm 3/14/2003 10:12:55 AM
Permanent Occupancy 3/14/20033/14/2003 DONE
Details
FIRE-Final Inspection11/20/200211/21/200211/21/2002APASS
DetailsTroy Cobbley
Earl, ###-####
BLD-Conference7/9/20017/9/20017/9/2001PDONE
DetailsTony Young
7/9/2001 9:15:54 AM 7/9/2001 9:15:49 AM 7/9/2001 9:15:43 AM 7/9/2001 9:15:37 AMnew contractor to finish project, need trades signed off, finsh out side, etc 7/10/2001 9:54:54 AM
BLD-Final6/20/20016/20/20016/20/2001PPASS
DetailsJoe Tawney
Added by Inspector: 406 On 6/20/2001 1:14:11 PM Reinsp OK for permanant occupancy

BLD-Final12/11/200012/12/200012/12/2000APART
DetailsTony Young
Scheduled by Inspector: 415 On 12/11/2000 3:47:47 PM
temp. occ. ok until all trades are signed off 12/12/2000 11:55:37 AM
BLD-Final12/12/200012/12/200012/12/2000APART
DetailsJoe Tawney
Added by Inspector: 406 On 12/12/2000 Reinsp OK for temporary occupancy Curb striping
BLD-Final12/9/200012/11/200012/11/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/09/2000 at 08:50:27. Contact: ###-####.
tepm occ. ok,, need to finish 12/11/2000 3:51:05 PM
FIRE-Final Inspection12/10/200012/11/200012/11/2000AFAIL
DetailsJoe Tawney
###-####. Reinsp Fail Not ready 12/11/2000 12:37:18 PM
FIRE-Final Inspection12/7/200012/8/200012/8/2000AFAIL
DetailsJoe Tawney
Bill, ###-#### Final Fail C/N issued 12/8/2000 1:23:48 PM
FIRE-Final Inspection12/7/200012/8/200012/8/2000ACANC
DetailsJoe Tawney
Bill ###-#### Cancel duplicate entry 12/8/2000 1:34:51 PM
BLD-Energy code compliance12/7/200012/7/200012/7/2000PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 12/07/2000 at 11:26:17. Contact: ###-####.
BLD-Energy code compliance10/23/200010/23/200010/23/2000PPASS
DetailsTony Young
miki ###-####
check stairs later 10/23/2000 2:59:56 PM
BLD-Energy code compliance10/20/200010/20/200010/20/2000PPART
DetailsTony Young
Miki ###-####
c/n posted, ok to rock unaffected areas 10/20/2000 4:57:05 PM
BLD-Framing/Rough-in10/16/200010/16/200010/16/2000PPART
DetailsTony Young
miki ###-####
ok to insulate 10/16/2000 4:59:11 PM
BLD-Framing/Rough-in9/13/20009/13/20009/13/2000PPART
DetailsTony Young
MIKI ###-#### SHEAR WALL INSP
ok to side,,, inspection on exterior only 9/14/2000 10:52:38 AM
BLD-Framing/Rough-in8/14/20008/15/20008/15/2000APART
DetailsTony Young
###-####-- MICKEY-- 2ND FLOOR- SHEETROCK
ok
8/15/2000 11:00:22 AM
BLD-Framing/Rough-in7/21/20007/24/20007/24/2000AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 07/21/2000 at 14:09:12. Contact: ###-####. Need engineer fix on fire walls- hold downs and breaks in firewall for plumbing. 7/24/00 1:26:29 PM
FIRE-Final Inspection7/21/20007/21/20007/21/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 07/21/2000 at 09:10:35. Contact: ###-####. Should be structural inspection for firewall 7/24/00 1:05:21 PM
BLD-Framing/Rough-in7/20/20007/20/20007/20/2000PFAIL
DetailsTony Young
fire wall hannah ###-#### Not ready 7/21/00 9:11:52 AM
BLD-Foundation6/16/20006/19/20006/19/2000APASS
DetailsTony Young
Scheduled by Inspector: 338 On 6/16/00 inspected 6/16/2k
BLD-Concrete6/16/20006/16/20006/16/2000PFAIL
Details
Added by Inspector: 338 On 6/16/00 hold downs not placed
BLD-Foundation6/15/20006/15/20006/15/2000PFAIL
Details
steve ###-#### holddowns not installed eng to locate same; need 14" between horiz reinf at alt brce panels 6/15/00 4:21:58 PM
BLD-Footing6/7/20006/8/20006/8/2000APART
Details
steve-- ###-#### ft eng to address stem wall holddowns 6/8/00 10:59:59 AM