Permanent Occupancy | | 9/27/2000 | 9/27/2000 | | DONE |
|
|
|
|
BLD-Final | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/07/2000 at 16:41:35. Contact: ###-####.c/n, rails, insul, smoke det, other finals. ok for t/o 9/8/2000 4:05:20 PM
|
FIRE-Final Inspection | 9/8/2000 | 9/8/2000 | 9/8/2000 | P | PASS |
Joe Tawney
|
|
|
###-####- leonard fire fn Final OK for permanant occupancy 9/8/2000 4:33:42 PM
|
FIRE-Final Inspection | 9/7/2000 | 9/8/2000 | 9/8/2000 | A | FAIL |
Joe Tawney
|
|
|
lenard ###-#### fire fn Final Fail Fire ext and smoke detector 9/8/2000 1:14:07 PM
|
BLD-Final | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Carl Dependahl
|
|
|
leanard ###-#### fn occ, need other finals 9/7/2000 3:38:22 PM
|
BLD-Wall cover | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Carl Dependahl
|
|
|
1hr. lid @ 1st fl.
|
BLD-Framing/Rough-in | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### call Lee to meet there Seal draft stop,- ok to rock, need gyp insp. 7/7/00 1:36:26 PM
|
BLD-Framing/Rough-in | 6/30/2000 | 7/5/2000 | 7/5/2000 | A | FAIL |
Jim Sly
|
|
|
jed ###-#### reinspection Comlete prev corr and new ones. 7/5/00 11:29:16 AM
|
BLD-Framing/Rough-in | 6/29/2000 | 6/29/2000 | 6/29/2000 | P | PART |
Carl Dependahl
|
|
|
jed ###-#### ok to side 7/3/00 8:36:18 AM
|
BLD-Framing/Rough-in | 6/28/2000 | 6/28/2000 | 6/28/2000 | P | FAIL |
Carl Dependahl
|
|
|
jed ###-#### c/n: blocking, firestops, draft stop 6/29/00 9:56:40 AM
|
BLD-Conference | 6/19/2000 | 6/19/2000 | 6/19/2000 | | PART |
Carl Dependahl
|
|
|
Rated doors not required at front entry.
|
BLD-Framing/Rough-in | 5/25/2000 | 5/26/2000 | 5/26/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Common 1hr wall(s) ok. 5/26/00 1:46:22 PM
|
BLD-Framing/Rough-in | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PASS |
Jim Storey
|
|
|
Rick Carley ###-#### 1st floor fire wall ok 5/16/00 8:23:58 AM
|
BLD-Foundation | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PASS |
Jim Storey
|
|
|
###-####
|