BLD-Final | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Wall cover | 5/19/2000 | 5/22/2000 | 5/22/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/19/2000 at 13:09:55. Contact: ###-####. Framing & e/code ok 5/23/00 2:18:32 PM
|
BLD-Wall cover | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/18/2000 at 08:23:30. Contact: ###-####. C/N posted 5/22/00 9:02:34 AM
|
BLD-Framing/Rough-in | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PART |
|
|
|
###-#### ok to insulate, c/n in force from 5/1/00 and today need lateral blocking of tusses 5/17/00 7:23:08 AM
|
BLD-Framing/Rough-in | 5/1/2000 | 5/1/2000 | 5/1/2000 | P | PASS |
Russ Owen
|
|
|
###-####. Ok to side/left correction for upper floor posted on window.
|
BLD-Foundation | 4/4/2000 | 4/5/2000 | 4/5/2000 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | PART |
Tom Arcoraci
|
|
|
###-#### Forms incomplete 4/4/00 1:02:42 PM
|