BLD-Final | 6/7/2000 | 6/7/2000 | 6/7/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/07/2000 at 08:51:32. Contact: ###-####. C/C #19529 6/13/00 3:23:03 PM
|
BLD-Framing/Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 08:44:55. Contact: ###-####. energy code pass 5/9/00 11:33:10 AM
|
BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 09:54:07. Contact: ###-####. C/N point loads. 5/8/00 9:09:30 AM
|
BLD-Framing/Rough-in | 5/3/2000 | 5/3/2000 | 5/3/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 09:16:28. Contact: ###-####. Shear ok 5/4/00 11:35:15 AM
|
BLD-Footing | 4/5/2000 | 4/6/2000 | 4/6/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### Not ready will re-call 4/6/00 3:02:28 PM
|
BLD-Footing | 4/6/2000 | 4/6/2000 | 4/6/2000 | P | PART |
Jim Sly
|
|
|
###-#### Footing appears ok 4/7/00 8:51:28 AM
|