BLD-Final | 1/5/2001 | 1/5/2001 | 1/5/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/05/2001 at 11:13:17. Contact: ###-####.c/c issued 1/5/2001 3:48:11 PM
|
BLD-Final | 12/26/2000 | 12/26/2000 | 12/26/2000 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/26/2000 at 10:55:20. Contact: ###-####.
c/n posted, and verify that ftgs and stemwall were looked at. 12/26/2000 3:02:59 PM
|
BLD-Energy code compliance | 5/8/2000 | 5/11/2000 | 5/11/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 10:54:58. Contact: ###-####. Frame pass 5/12/00 8:53:34 AM
|
BLD-Framing/Rough-in | 5/8/2000 | 5/9/2000 | 5/9/2000 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 10:51:48. Contact: ###-####. C/N issued. 5/11/00 11:03:54 AM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/04/2000 at 10:08:32. Contact: ###-####. Fireplace R/I only ok 5/5/00 10:17:02 AM
|