BLD-Final | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | PASS |
Jim Sly
|
|
|
PJ Smith ###-#### C/C issued 2/22/2001 4:42:08 PM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
Jim Sly
|
|
|
Pj ###-#### Need calcs for footings at (2) major point loads, OK to start rock. 6/23/00 11:35:40 AM
|
BLD-Framing/Rough-in | 6/19/2000 | 6/20/2000 | 6/20/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### C/N; I-joist roof framing; bearing, headers, air seal, etc. 2 pager. 316's area. 6/21/00 11:39:07 AM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | PART |
Jim Sly
|
|
|
pj ###-#### Shear ok 6/13/00 11:53:48 AM
|
BLD-Framing/Rough-in | 6/6/2000 | 6/6/2000 | 6/6/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Complete prev. corr. 6/7/00 8:26:29 AM
|
BLD-Framing/Rough-in | 5/31/2000 | 5/31/2000 | 5/31/2000 | P | FAIL |
Jim Sly
|
|
|
PJ ###-#### C/N issued. 6/1/00 11:34:25 AM
|
BLD-Foundation | 4/25/2000 | 4/25/2000 | 4/25/2000 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 06:02:36. Contact: ###-####.
|
BLD-Footing | 4/24/2000 | 4/24/2000 | 4/24/2000 | P | PART |
Jim Sly
|
|
|
###-#### Foot appears ok 4/26/00 12:09:47 PM
|