BLD-Final | 5/15/2000 | 5/16/2000 | 5/16/2000 | A | PASS |
Carl Dependahl
|
|
|
###-#### w/Bld00-00709 for racks; ok for C/O. 5/17/00 1:56:38 PM
|
FIRE-Final Inspection | 5/15/2000 | 5/15/2000 | 5/15/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp. ok for perm. occ. 5/16/00 10:04:21 AM
|
Permanent Occupancy | | 5/15/2000 | 5/15/2000 | | DONE |
|
|
|
|
BLD-Final | 5/11/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Has fire & htg. C/N recall. 5/15/00 11:06:02 AM
|
FIRE-Final Inspection | 5/12/2000 | 5/12/2000 | 5/12/2000 | P | FAIL |
Joe Tawney
|
|
|
jim ###-####- fire fn Final fail C/N issued. 5/15/00 11:00:25 AM
|
BLD-Framing/Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | PART |
Carl Dependahl
|
|
|
###-#### Ok, rec'd eng's letter re: shear walls ceiling ok. 5/11/00 4:12:31 PM
|
BLD-Framing/Rough-in | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Need eng's letter re: shear walls, keep C/N, talked to supt. 5/8/00 9:32:53 AM
|
FIRE-Final Inspection | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final fail C/N issued. 5/5/00 1:44:55 PM
|
BLD-Framing/Rough-in | 5/2/2000 | 5/3/2000 | 5/3/2000 | P | PART |
|
|
|
jim ###-#### ok for ctr to cover 1-side 5/4/00 7:43:24 AM
|
BLD-Conference | 4/28/2000 | 4/28/2000 | 4/28/2000 | P | PASS |
Carl Dependahl
|
|
|
W/supt.
|
BLD-Footing | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | PART |
Carl Dependahl
|
|
|
###-#### early pm Int. pad for mezzanine 4/20/00 9:41:24 AM
|