BLD-Final | 7/7/2000 | 7/10/2000 | 7/10/2000 | P | PASS |
Carl Dependahl
|
|
|
cole ###-#### L/C 16885 7/11/00 11:35:24 AM
|
BLD-Final | 7/3/2000 | 7/6/2000 | 7/6/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Keep c/m 7/7/00 1:35:45 PM
|
BLD-Final | 6/30/2000 | 7/3/2000 | 7/3/2000 | A | CANC |
Jim Sly
|
|
|
###-#### key above front door Done by 338 7/3/00 11:26:54 AM
|
BLD-Final | 7/3/2000 | 7/3/2000 | 7/3/2000 | A | FAIL |
|
|
|
Added by Inspector: 338 On 7/3/00 energy seal and need elec final signoff
|
BLD-Energy code compliance | 5/8/2000 | 5/9/2000 | 5/9/2000 | P | PASS |
Carl Dependahl
|
|
|
Please call first. Kole- ###-####. Insul. ok 5/11/00 10:57:14 AM
|
BLD-Framing/Rough-in | 5/8/2000 | 5/9/2000 | 5/9/2000 | A | PART |
Carl Dependahl
|
|
|
Kole ###-#### Need eng's ok for truss "fix" (hanger nailing). 5/11/00 10:55:08 AM
|
BLD-Framing/Rough-in | 5/5/2000 | 5/8/2000 | 5/8/2000 | A | FAIL |
Jim Sly
|
|
|
kole Crofts ###-#### late morning early pm C/N truss eng. to ok teco. nails @ hangers. 5/9/00 11:43:20 AM
|
BLD-Framing/Rough-in | 5/3/2000 | 5/5/2000 | 5/5/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-#### C/N N/R; no plans or other inspe- $42.00 next time N/R 5/8/00 9:36:55 AM
|
BLD-Framing/Rough-in | 4/25/2000 | 4/25/2000 | 4/25/2000 | P | PART |
Carl Dependahl
|
|
|
shear wall cole ###-#### OK to side. 4/26/00 11:15:17 AM
|
BLD-Framing/Rough-in | 4/21/2000 | 4/24/2000 | 4/24/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### Shear- recall, add blocks & nail panels per plan. 4/26/00 12:17:09 PM
|
BLD-Foundation | 4/17/2000 | 4/18/2000 | 4/18/2000 | A | PART |
Carl Dependahl
|
|
|
###-####
|
BLD-Footing | 4/13/2000 | 4/14/2000 | 4/14/2000 | A | PART |
Carl Dependahl
|
|
|
###-####-kole ft Ftg. recall ok. 4/17/00 1:35:51 PM
|