BLD-Final | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Dave Hannah
|
|
|
KAY ###-#### FN c/c issued 12/21/2000 11:32:55 AM
|
BLD-Final | 12/19/2000 | 12/20/2000 | 12/20/2000 | A | FAIL |
Jim Sly
|
|
|
Kay Bokman ###-####
|
BLD-Final | 12/20/2000 | 12/20/2000 | 12/20/2000 | P | FAIL |
Jim Sly
|
|
|
Kay ###-####
|
BLD-Framing/Rough-in | 10/16/2000 | 10/17/2000 | 10/17/2000 | A | PASS |
Jim Sly
|
|
|
kay ###-#### fr--the plans by the furnace Energy pass 10/17/2000 10:40:04 AM
|
BLD-Framing/Rough-in | 10/13/2000 | 10/16/2000 | 10/16/2000 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/13/2000 at 12:00:44. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | CANC |
Tom Arcoraci
|
|
|
says it has to be him Kay ###-#### basement--CANCEL PERMIT PER KAY
|
BLD-Framing/Rough-in | 10/11/2000 | 10/12/2000 | 10/12/2000 | A | CANC |
Tom Arcoraci
|
|
|
says it has to be him Kay ###-#### basement
|
BLD-Framing/Rough-in | 10/12/2000 | 10/12/2000 | 10/12/2000 | P | FAIL |
Jim Sly
|
|
|
FR INSP KAY-- ###-#### C/N issued 10/12/2000 3:10:17 PM
|
BLD-Framing/Rough-in | 10/2/2000 | 10/3/2000 | 10/3/2000 | A | CANC |
Tom Arcoraci
|
|
|
follow up on shear Kay Bockman ###-####
|
BLD-Framing/Rough-in | 10/3/2000 | 10/3/2000 | 10/3/2000 | P | PART |
Jim Sly
|
|
|
says it has to be Jim Sly Kay ###-#### shear wall OK. 10/3/2000 1:52:58 PM
|
BLD-Framing/Rough-in | 9/27/2000 | 9/28/2000 | 9/28/2000 | A | FAIL |
Jim Sly
|
|
|
SHEAR PANEL-- ERIC-- ###-#### NR 9/28/2000 10:10:58 AM
|
BLD-Foundation | 8/7/2000 | 8/7/2000 | 8/7/2000 | P | PART |
Jim Sly
|
|
|
WALL ###-#### Insp. of Gar wall...Appears OK but no appr plans on site. 8/7/2000 2:29:03 PM
|
BLD-Foundation | 8/4/2000 | 8/4/2000 | 8/4/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/04/2000 at 09:50:17. Contact: ###-####. conference 8/4/2000 2:24:39 PM
|
BLD-Footing | 7/24/2000 | 7/25/2000 | 7/25/2000 | A | FAIL |
Alan Hauser
|
|
|
Eric ###-#### Poured 7/26/00 10:50:33 AM
|
BLD-Other | 7/19/2000 | 7/19/2000 | 7/19/2000 | A | PASS |
|
|
|
received letter from dean briggs siting an on site viusit by his charge letter is submitted to 316 message box in supervisors office.
|
BLD-Footing | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PART |
Jim Sly
|
|
|
eric ###-####
|
BLD-Foundation | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | PART |
|
|
|
###-#### pending letter from eng addressing on site visit to insure compliance with his specs and eng submitted 7/17/2000 11:35:36 AM
|
BLD-Foundation | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
|
|
|
eng letter of site insp is required prior to city ok to pour concrete 7/13/2000 6:23:45 PM
|
BLD-Framing/Rough-in | 6/27/2000 | 6/27/2000 | 6/27/2000 | P | PART |
Jim Sly
|
|
|
conference only eric ###-#### Conf on freeze block type foundation. 6/27/00 4:39:51 PM
|
BLD-Footing | 6/9/2000 | 6/9/2000 | 6/9/2000 | P | PART |
Jim Sly
|
|
|
###-####
|
BLD-Conference | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PART |
Jim Sly
|
|
|
Eric Bokman ###-#### please call before you go out so he can meet you out there.
|