BLD-Final | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | FAIL |
Jim Storey
|
|
|
rob ###-#### fn occ pending ele final. 8/4/2000 8:52:50 AM
|
BLD-Final | 7/26/2000 | 7/26/2000 | 7/26/2000 | P | FAIL |
Jim Storey
|
|
|
jEFF ###-####
|
BLD-Framing/Rough-in | 6/5/2000 | 6/7/2000 | 6/7/2000 | P | PASS |
Jim Storey
|
|
|
thermal - jeff ###-####
|
BLD-Framing/Rough-in | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PASS |
Jim Storey
|
|
|
jeff ###-####
|
BLD-Framing/Rough-in | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | CANC |
|
|
|
###-#### done by 408 5/18/00 4:00:04 PM
|
BLD-Framing/Rough-in | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | CANC |
|
|
|
###-#### done by 408 5/18/00 3:58:21 PM
|
BLD-Framing/Rough-in | 5/18/2000 | 5/18/2000 | 5/18/2000 | P | PART |
Tom Arcoraci
|
|
|
Ok to side.
|
BLD-Framing/Rough-in | 5/18/2000 | 5/18/2000 | 5/18/2000 | A | PART |
Tom Arcoraci
|
|
|
Ok to side.
|
BLD-Concrete | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 16:01:36. Contact: ###-####. placed w/o insp. 4/20/00 3:12:06 PM
|
BLD-Footing | 4/19/2000 | 4/19/2000 | 4/19/2000 | P | PART |
Jim Storey
|
|
|
###-#### placed w/o inspection setback ok. 4/19/00
|