Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-00899
StatusFinaled
Name ST LUKES
Site Address 300 E JEFFERSON ST
Project NameST LUKES MOB
Customer NumberSTL200412
ePlanReviewNo
Description
(ST LUKES MOB - IDAHO CARDIOLOGY) - To remodel portions of the existing tenants 7,826 sq. ft. office, exam room & waiting areas to reduce the waiting area size and create a new chart storage room; to reverse door swing as indicated; remove cabinetry and sinks to create new offices; new research offices & storage area; a new break room and 20% of project costs toward improving accessibility, per approved plans on file. Work to include metal stud construction with sheetrock cover; alteration to suspended ceiling system;addition of new wire glass window in interior education room #1 wall; light & mechanical fixture's; and wall & floor finishes in specified areas. NOTE: This building is fully fire sprinklered with sprinkler system used for story increase. Area originally approved with smoke detectors in corridors in conjunction with sprinklers for substitution for 1- hour corridors - maintain original code compliance. (P.C.#240-00)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/3/20018/6/20018/6/2001ACANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/03/2001 at 07:55:11. Contact: ###-####...wrong permit #? 8/6/2001 10:36:19 AM
BLD-Final7/31/20018/1/20018/1/2001PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/31/2001 at 09:55:17. Contact: ###-####.
BLD-Final9/6/20009/6/20009/6/2000PPASS
Details
Scheduled by a contractor via Hello! on 09/06/2000 at 08:16:57. Contact: ###-####. signed the perm col for 409 and myself in the occ request card 9/6/2000 4:59:05 PM
BLD-Final8/31/20009/1/20009/1/2000PFAIL
Details
Scheduled by a contractor via Hello! on 08/31/2000 at 14:36:00. Contact: ###-####. no resp person a, no answer at contact 9/1/2000 4:42:17 PM
FIRE-Final Inspection8/31/20009/1/20009/1/2000AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/31/2000 at 15:20:01. Contact: ###-####. sprinklers overspaced in chart storage room 9/1/2000 10:39:17 AM
FIRE-Final Inspection9/1/20009/1/20009/1/2000PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 9/1/2000
FIRE-Final Inspection8/29/20008/30/20008/30/2000ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/29/2000 at 15:14:46. Contact: ###-####. will call to reschedule 8/30/2000 9:30:07 AM
FIRE-Final Inspection8/21/20008/23/20008/23/2000ANR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 08/21/2000 at 09:50:01. Contact: ###-####.
BLD-Conference7/14/20007/14/20007/14/2000APASS
Details
Added by Inspector: 338 On 7/14/2000 made walk through of project in progress