BLD-Final | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### key in panel box or above front door L/C issued. 6/15/00 11:31:46 AM
|
BLD-Framing/Rough-in | 5/18/2000 | 5/18/2000 | 5/18/2000 | A | PASS |
Carl Dependahl
|
|
|
shear wall insp--mike ###-#### --per carl for am C/N ok 5/22/00 9:29:13 AM
|
BLD-Energy code compliance | 5/15/2000 | 5/17/2000 | 5/17/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### 2nd. C/N ext. nailing. 5/18/00 3:03:11 PM
|
BLD-Framing/Rough-in | 5/15/2000 | 5/16/2000 | 5/16/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### C/N nailing; air seal 5/18/00 3:00:39 PM
|
BLD-Foundation | 5/3/2000 | 5/3/2000 | 5/3/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/03/2000 at 07:12:46. Contact: ###-####.
|
BLD-Footing | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/02/2000 at 09:51:24. Contact: ###-####. Not ready 5/3/00 3:38:14 PM
|