Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD00-00964
StatusFinaled
Name WASHINGTON TRUST BANK
Site Address 7930 W FAIRVIEW AVE
Project NameWASHINGTON TRUST BANK
Customer Number 
ePlanReviewNo
Description
TO REMODEL EXISTING BANK OFFICE BUILDING. To remodel the interior of the existing space to create new private office's, new teller area, vestibule, breakroom & accessible restrooms; to modify the North & South central exterior wall location by adding a new foundation wall on each side to remove the existing 4 foot offset & enlarge floor area; to add new glazing on both side & relocate the entry doors; to add a high pitch roof overbuild and canopy & columns at the new entry. All per the approved plans. PC#00-263/ drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/18/20008/18/2000 DONE
Details
BLD-Final8/10/20008/11/20008/11/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/10/2000 at 15:21:43. Contact: . ok for perm occ 8/11/2000 11:52:11 AM
8/11/2000 11:53:02 AM
FIRE-Final Inspection8/10/20008/10/20008/10/2000PPASS
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/10/2000 at 10:48:49. Contact: . Reinsp. ok for perm. occ. 8/11/00 12:02:25 PM
FIRE-Final Inspection8/8/20008/8/20008/8/2000PFAIL
DetailsJoe Tawney
Scheduled by a contractor via Hello! on 08/08/2000 at 10:31:36. Contact: . final fail C/N issued 8/10/00 11:26:24 AM
BLD-Framing/Rough-in7/11/20007/12/20007/12/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 15:55:50. Contact: . front roof framing ok 7/12/00 3:34:07 PM
BLD-Framing/Rough-in7/11/20007/12/20007/12/2000APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/11/2000 at 15:55:50. Contact: .
BLD-Framing/Rough-in6/9/20006/9/20006/9/2000APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 06/09/2000 at 07:18:47. Contact: ###-####. Ok to cover interior walls only...rebar front column ok 6/13/00 11:53:28 AM
BLD-Footing6/6/20006/7/20006/7/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/06/2000 at 14:12:49. Contact: ###-####.
BLD-Foundation6/1/20006/1/20006/1/2000PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/01/2000 at 07:53:25. Contact: ###-####. Mono pour 6/5/00 10:16:48 AM