BLD-Conference | 7/6/2000 | 7/6/2000 | 7/6/2000 | A | CANC |
|
|
|
Scheduled by Inspector: 338 On 7/6/00 looking for info 7/6/00 12:40:48 PM
|
BLD-Final | 7/5/2000 | 7/6/2000 | 7/6/2000 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 15:57:11. Contact: ###-####. No mech sign off. ok for perm. occ. when mech signs. 7/7/00 1:30:39 PM
|
FIRE-Final Inspection | 7/5/2000 | 7/5/2000 | 7/5/2000 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/05/2000 at 07:43:39. Contact: ###-####.
|
FIRE-Final Inspection | 5/25/2000 | 5/30/2000 | 5/30/2000 | A | FAIL |
Rick Jackson
|
|
|
###-#### 8:15 Sprinkler heads overspaced; penetrations in corridor wall. 5/30/00 3:47:47 PM
|
BLD-Framing/Rough-in | 5/9/2000 | 5/10/2000 | 5/10/2000 | A | FAIL |
|
|
|
ok to cover--doc--###-#### notready for insp 5/10/00 11:50:45 AM
|