BLD-Final | 11/14/2000 | 11/15/2000 | 11/15/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 10:23:35. Contact: ###-####...needfire, etc. recall 11/14/2000 2:58:15 PM
|
FIRE-Final Inspection | 11/14/2000 | 11/15/2000 | 11/15/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/14/2000 at 10:22:57. Contact: ###-####.
|
FIRE-Final Inspection | 10/20/2000 | 10/23/2000 | 10/24/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 11:34:58. Contact: ###-####. need exit sign at double doors outside bathroom; penetrations at 2 hr wall 10/24/2000 9:50:02 AM
|
FIRE-Final Inspection | 10/4/2000 | 10/5/2000 | 10/5/2000 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 17:40:35. Contact: ###-####. stopped by the construction office and nobody knew why the inspection was called in; they will reschedule 10/6/2000 9:55:49 AM
|
BLD-Conference | 7/14/2000 | 7/14/2000 | 7/14/2000 | A | PASS |
|
|
|
Added by Inspector: 338 On 7/14/2000 in progress walk through
|