BLD-Final | 8/10/2000 | 8/10/2000 | 8/10/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 10:00:56. Contact: ###-####. C/C #18767 8/11/00 12:03:44 PM
|
BLD-Final | 8/8/2000 | 8/9/2000 | 8/9/2000 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/08/2000 at 12:54:40. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/19/2000 | 7/19/2000 | 7/19/2000 | P | PASS |
Carl Dependahl
|
|
|
jim ###-#### reinspection Ok per record 6/26/00 7/20/00 9:40:52 AM
|
BLD-Energy code compliance | 6/26/2000 | 6/26/2000 | 6/26/2000 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 06:59:01. Contact: ###-####.
|
BLD-Wall cover | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/20/2000 at 07:33:53. Contact: ###-####. HD's straps. 6/21/00 11:41:18 AM
|
BLD-Framing/Rough-in | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PART |
|
|
|
JIM ###-#### made ok to insulate only bedroom holddowns ok with proper nailing inspection done may need to remove siding; entry area requires additional holddowns 6/15/00 8:00:09 AM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/12/2000 | 6/12/2000 | P | FAIL |
Alan Hauser
|
|
|
Jim ###-#### or ###-#### this is for a shear and a r/i LEFT C/N
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/08/2000 at 12:30:37. Contact: ###-####. Needs mechanical before frame, hold-downs at front c/n posted. 6/13/00 10:02:01 AM
|
BLD-Footing | 5/10/2000 | 5/10/2000 | 5/10/2000 | P | PART |
Carl Dependahl
|
|
|
Early start?? No plans 5/11/00 11:36:47 AM
|