Permit Information
Permit NumberBLD00-01086
StatusFinaled
Name DAVID T ROBISON
Site Address 5527 N QUAIL SUMMIT PL
Project NameHILLSIDE
Customer Number378-5426
ePlanReviewNo
Description
To construct a 2337 sq. ft. two story single family dwelling with a 1726 sq. ft. unfinished basement, two attached garages (922 sq. ft. four car at north side of structure)(288 sq. ft. one car at south side), and a 318 sq. ft. above grade redwood deck at rear of home per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1798 sq. ft.)(2nd floor 539 sq. ft.). This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system to be installed. Unless otherwise approved by the Boise City Fire Department, all lots shall be fitted with an NFPA 13D modified sprinkler system including attached garages. The sprinkler flow alarm shall be attached to the residence smoke detection system. Note: Seperate permits will be required to finish basement area. PC #412 CU #94-90 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20026/26/20026/26/2002PPASS
DetailsTony Young
already fn?-yeon- ###-####
BLD-Grading Inspection6/5/20026/5/20026/5/2002 PASS
DetailsRita DeYoung
Final grading and drainage approved.
BLD-Grading Inspection9/24/20019/24/20019/24/2001 BOND
DetailsRita DeYoung
Rough grading and most of revegetation complete. Fine grading and revegetation of rear slope must still be done. For this the engineer has recommended a $300.00 bond. Upon receipt of this the grading is conditionally accepted.
BLD-Final9/13/20019/13/20019/13/2001PPART
DetailsTony Young
###-####
ok for c of c after trade signoffs are done, (mainly Terry Records) 9/13/2001 3:12:02 PM
BLD-Final9/13/20019/13/20019/13/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 9/13/2001 11:46:18 AM Final OK for certificate of completion
BLD-Conference9/4/20019/4/20019/4/2001PPASS
DetailsTony Young
for deck & stairway- ###-####- yon--for conference
looked at guard rail, hand rails, etc
GR to loose/ need HR per code where reqd. 9/4/2001 4:30:18 PM
BLD-Energy code compliance2/12/20012/12/20012/12/2001PPART
DetailsTony Young
###-####
c/n on beams, waiting for fix from eng.,,wip on insulation 95% complete, ok to sheet rock unaffected areas 2/12/2001 1:50:04 PM
BLD-Energy code compliance2/5/20012/6/20012/6/2001APART
DetailsTony Young
Yeon ###-####
rim joists ok and seal package 2/6/2001 3:40:31 PM
BLD-Framing/Rough-in2/6/20012/6/20012/6/2001PPART
DetailsTony Young
Scheduled by Inspector: 415 On 2/6/2001 10:29:43 AM
most every thing ok, pending letter from engineer, ok to insulate , see c/n at energy code inspection 2/6/2001 3:42:22 PM
BLD-Energy code compliance2/1/20012/2/20012/2/2001AFAIL
DetailsTony Young
###-####
c/n still governs 2/2/2001 11:18:56 AM
BLD-Final1/30/20011/31/20011/31/2001AFAIL
DetailsCarl Dependahl
###-####, c/n, need eng's report for changes; beams, hd's & joists not per plan ...ok to insul rim & bsmt walls only. Partial, no trusses inspected. 1/31/2001 12:28:11 PM
BLD-Final1/30/20011/30/20011/30/2001PCANC
DetailsJim Sly
###-#### Canc by contr. 1/30/2001 4:55:16 PM
BLD-Framing/Rough-in1/26/20011/26/20011/26/2001PFAIL
DetailsTony Young
fr insp -###-####- yeon call 1st before insp
need trades signed off b4 inspection can be made 1/26/2001 1:10:53 PM
BLD-Conference9/8/20009/11/20009/11/2000APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 09/08/2000 at 18:59:56. Contact: ###-####.
BLD-Framing/Rough-in8/31/20009/1/20009/1/2000APART
DetailsTony Young
Scheduled by Inspector: 415 On 8/31/2000 yon ###-####
shear ok on north and part of east side. east side south of entry door needs fix on 2 hold downs. 9/1/2000 10:32:26 AM
BLD-Foundation8/31/20008/31/20008/31/2000PNR
DetailsTony Young
FOUND & SHEAR INSP--###-####--YON
ok to pour footings, shear walls not ready 8/31/2000 4:09:56 PM
BLD-Conference8/29/20008/29/20008/29/2000PPASS
DetailsTony Young
FOR CONF INSP--ROBERT---- ###-#### CELL
conf. on stairs 8/29/2000 4:08:54 PM
BLD-Conference8/21/20008/22/20008/22/2000ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 08/21/2000 at 20:31:30. Contact: ###-####.
BLD-Foundation7/24/20007/25/20007/25/2000APART
DetailsTony Young
###-#### WIP (work in progress) 7/26/00 10:54:34 AM
BLD-Foundation7/21/20007/24/20007/24/2000APART
DetailsTony Young
Jack ###-#### Already poured- note: Carl looked at some of the rebar late on 7/21/00 ok 7/25/00 9:36:50 AM
BLD-Foundation7/21/20007/21/20007/21/2000PPART
DetailsTony Young
dick---###-#### found insp No rebar placed yet 7/24/00 1:05:50 PM
BLD-Foundation6/27/20006/28/20006/28/2000PPART
DetailsTony Young
###-#### work in progress 6/29/00 10:06:47 AM
BLD-Foundation6/22/20006/23/20006/23/2000APART
DetailsTony Young
Jack ###-#### All appears ok per plan 6/23/00 3:14:16 PM
BLD-Footing6/21/20006/22/20006/22/2000PFAIL
DetailsTony Young
HOMEOWNER-- JACK--- ###-#### FT Footings not thick enough per plan. 6/23/00 11:24:30 AM