Permanent Occupancy | | 5/10/2001 | 5/10/2001 | | DONE |
|
|
|
|
BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Dave Hannah
|
|
|
###-####please call before you go 5/9/2001 2:14:56 PM 5/9/2001 3:01:39 PM ok for permanent occ. 5/10/2001 3:08:51 PM
|
FIRE-Final Inspection | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | CANC |
Joe Tawney
|
|
|
###-#### please call before you go Cancel Permit already finaled 5/9/2001 11:02:11 AM
|
BLD-Final | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/17/2001 4:32:02 PM REinsp OK for permanant occupancy
|
BLD-Final | 9/1/2000 | 9/5/2000 | 9/5/2000 | P | PART |
Tom Arcoraci
|
|
|
###-#### ok for temp occ cn posted 9/6/2000 8:07:23 AM
|
FIRE-Final Inspection | 9/1/2000 | 9/5/2000 | 9/5/2000 | A | PART |
Joe Tawney
|
|
|
9/5/2000 9:59:38 AM Reinsp OK for temp occ 9/5/2000 12:57:05 PM
|
FIRE-Final Inspection | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | FAIL |
Joe Tawney
|
|
|
DENNIS-- ###-#### FIRE FN Fail C/N issued 8/31/2000 2:56:43 PM
|
FIRE-Final Inspection | 8/24/2000 | 8/25/2000 | 8/25/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail Arrived 8:30 AM Bldg locked. 8/25/2000 12:57:05 PM
|
BLD-Other | 8/10/2000 | 8/11/2000 | 8/11/2000 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 22:44:26. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Tom Arcoraci
|
|
|
DUTCH-- ###-#### FR cn posted for beam connection and spec insp reports 8/2/2000 4:30:47 PM
|
BLD-Framing/Rough-in | 7/28/2000 | 7/31/2000 | 7/31/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-####-thomas fr not ready will recall 8/1/2000 3:36:36 PM
|
BLD-Energy code compliance | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | CANC |
|
|
|
###-#### not req on com projects 7/13/2000 6:27:03 PM
|
BLD-Foundation | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | PART |
|
|
|
dennis ###-#### need sp insp paperwork on the epoxy bars placement all placed ok to pour 7/3/00 3:17:06 PM
|