BLD-Final | 9/20/2000 | 9/21/2000 | 9/21/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/20/2000 at 13:58:30. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | CANC |
Jim Sly
|
|
|
reinspection for late pm please aj ###-####
|
BLD-Conference | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 11:43:55. Contact: ###-####.
|
BLD-Final | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 7/13/2000
|
BLD-Framing/Rough-in | 7/13/2000 | 7/13/2000 | 7/13/2000 | P | FAIL |
Russ Owen
|
|
|
A.J. ###-####- RE-INSP FR Done on 7/14/00 C/N posted 7/14/00 2:23:07 PM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/11/2000 | 7/11/2000 | P | FAIL |
|
|
|
Aj ###-#### not ready for insp 10 notes on c/n prior to even opening plans mus recall whenready for insp. 7/11/00 1:54:31 PM
|
BLD-Framing/Rough-in | 6/26/2000 | 6/27/2000 | 6/27/2000 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/26/2000 at 11:51:49. Contact: ###-####. C/N...Need retro HDs Gar & house front Nailing OK. 6/27/00 10:37:50 AM
|
BLD-Footing | 5/4/2000 | 5/5/2000 | 5/5/2000 | A | PART |
Alan Hauser
|
|
|
###-####
|
BLD-Footing | 5/5/2000 | 5/5/2000 | 5/5/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Poured w/o insp. 1:45 pm no verify horiz. for HD's (retros fit all @ frame). 5/8/00 9:09:22 AM
|