BLD-Conference | 6/17/2003 | 6/18/2003 | 6/18/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Tony, Vista const...ok to use restrooms prior to "Final" 6/18/2003 2:36:41 PM
|
BLD-Conference | 5/5/2003 | 5/6/2003 | 5/6/2003 | P | PASS |
Carl Dependahl
|
|
|
w/ Mike W. Vista construction re ADA reqs at bath rm 5/6/2003 3:24:11 PM
|
BLD-Conference | 4/9/2003 | 4/10/2003 | 4/10/2003 | P | PART |
Carl Dependahl
|
|
|
ele ok'd final 4/10/2003 5:24:39 PM
|
BLD-Conference | 3/31/2003 | 4/1/2003 | 4/1/2003 | A | PASS |
Carl Dependahl
|
|
|
Need finals, issued N&O. 4/1/2003 8:54:59 AM
|
BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/29/2002 3:36:06 PM w/ prop mgr, keep c/n's re upgrade
|
BLD-Conference | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/25/2002 at 10:37:28. Contact: ###-####. keep c/n re doors , rails etc. 1/25/2002 5:57:04 PM
|
FIRE-Final Inspection | 3/6/2001 | 3/7/2001 | 3/7/2001 | A | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 3/2/2001 | 3/2/2001 | 3/2/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/2/2001 11:29:14 AM re c/n w/ bldr...replace doors as shown
|
BLD-Conference | 2/15/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/15/2001 11:45:16 AM c/n issued; need clarify doors ( 90m. at corr. at 4th fl.) verify trade insps
|
BLD-Conference | 2/14/2001 | 2/14/2001 | 2/14/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/14/2001 9:30:37 AM w/ new contractor re insp process
|
BLD-Conference | 2/12/2001 | 2/12/2001 | 2/12/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/12/2001 9:15:14 AM w/contractor
|
BLD-Final | 2/8/2001 | 2/9/2001 | 2/9/2001 | A | FAIL |
Jim Storey
|
|
|
Darren ###-#### corridor thru protection required / s lables required on door assemblies 2/9/2001 3:02:30 PM
|
BLD-Conference | 2/8/2001 | 2/8/2001 | 2/8/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/8/2001 5:23:18 PM w/ Darren, Mike Mullin,etc. at city, need verify approvals w/ other insp's
|
BLD-Framing/Rough-in | 9/13/2000 | 9/13/2000 | 9/13/2000 | P | PART |
|
|
|
R/I INSP -WENDY ###-#### 3RD & 4TH FL CODE UPGRADE pending submittals from the arch 9/14/2000 9:22:54 AM
|
BLD-Final | 2/20/2001 | 2/20/2001 | 2/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### c/n, doors seals, seal corridors, handrail at north stair, etc. 2/21/2001 1:17:48 PM
|