BLD-Conference | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 4/9/2001 3:21:12 PM
|
BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 | P | PASS |
Russ Owen
|
|
|
###-#### DWAYNE --GAR CODE IS 1001ENTER
|
BLD-Final | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | FAIL |
Jim Storey
|
|
|
dwayne ###-#### gar code 1001enter-fn occ landinds exterior36 min/saftey glazing/handrail sopport. 4/6/2001 10:45:43 AM
|
BLD-Final | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | FAIL |
Tom Arcoraci
|
|
|
1001 garage code not ready 3/28/2001 12:00:05 PM
|
BLD-Energy code compliance | 12/11/2000 | 12/12/2000 | 12/12/2000 | A | PASS |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/6/2000 | 12/6/2000 | 12/6/2000 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/06/2000 at 10:23:55. Contact: ###-####. c/n made ok. 12/6/2000 2:58:20 PM
|
BLD-Energy code compliance | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | NR |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 11/28/2000 | 11/28/2000 | 11/28/2000 | P | NR |
Jim Storey
|
|
|
###-#### front unit ok back unit c/n not done. 11/28/2000 4:03:13 PM
|
BLD-Framing/Rough-in | 11/21/2000 | 11/22/2000 | 11/22/2000 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/21/2000 at 15:12:07. Contact: ###-####. fire wall not installed in unusable space behind tub 2 nd floor / mud rings not listed for 1hr wall protection / no engineering to justify the cantalever on void 2 nd floor joist to not be replaced. 11/22/2000 2:56:36 PM
|
BLD-Framing/Rough-in | 11/10/2000 | 11/13/2000 | 11/13/2000 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/10/2000 at 12:08:01. Contact: ###-####. c/n issued 11/13/2000 11:50:27 AM
|
BLD-Framing/Rough-in | 10/23/2000 | 10/24/2000 | 10/24/2000 | P | NR |
Steven Webb
|
|
|
Jim needs to go out noone else please Jim wants to meet and talk to dwayne ###-####; Pointed out items on prior c/n needing correction, marked on c/n.
|
BLD-Framing/Rough-in | 10/20/2000 | 10/23/2000 | 10/23/2000 | A | CANC |
Steven Webb
|
|
|
###-####---cancel per dwayne
|
BLD-Framing/Rough-in | 10/23/2000 | 10/23/2000 | 10/23/2000 | P | NR |
Steven Webb
|
|
|
dwayne ###-#### fr insp. No plans on site. Plumbing only on north unit.CN poseted.
|
BLD-Framing/Rough-in | 9/20/2000 | 9/21/2000 | 9/21/2000 | A | FAIL |
Jim Storey
|
|
|
###-#### do not insulate c/n posted out of red tags. 9/21/2000 5:39:37 PM
|
BLD-Framing/Rough-in | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 17:58:12. Contact: ###-####. exterior ok for cover. 8/31/2000 3:19:26 PM
|
BLD-Wall cover | 8/22/2000 | 8/22/2000 | 8/22/2000 | A | PASS |
|
|
|
lower double wall between units, the draft stop is in place.
|
BLD-Footing | 7/18/2000 | 7/18/2000 | 7/18/2000 | P | PASS |
Jim Storey
|
|
|
###-####
|