BLD-Final | 2/9/2001 | 2/9/2001 | 2/9/2001 | P | PASS |
Jim Sly
|
|
|
Gary ###-#### C/C issued. 2/9/2001 4:32:07 PM
|
BLD-Final | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | FAIL |
Jim Sly
|
|
|
the key is on top of the power meter on east side of the garage Gary ###-#### C/N....Need 20 min door and closer at Mech room. 2/8/2001 2:02:25 PM
|
BLD-Final | 1/21/2001 | 1/22/2001 | 1/22/2001 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 01/21/2001 at 17:06:20. Contact: ###-####. No instructions for access....Called contact #.....busy...... 1/22/2001 2:24:03 PM
|
BLD-Final | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### key will be on top of outside power meter
|
BLD-Final | 12/20/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Jim Sly
|
|
|
###-#### key will be on top of outside power meter
|
BLD-Energy code compliance | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Jim Sly
|
|
|
susie ###-#### energy code Frame pass 6/23/00 3:59:00 PM
|
BLD-Framing/Rough-in | 6/21/2000 | 6/22/2000 | 6/22/2000 | A | FAIL |
Jim Sly
|
|
|
###-#### call to meet there
|
BLD-Framing/Rough-in | 6/14/2000 | 6/14/2000 | 6/14/2000 | P | PART |
Jim Sly
|
|
|
Rick ###-#### Shear ok 6/15/00 11:27:20 AM
|
BLD-Footing | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PART |
Jim Sly
|
|
|
###-#### Foot appears ok 5/18/00 3:09:43 PM
|