Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01200
StatusFinaled
Name STETSON HOMES INC
Site Address 5103 E TRAIL WIND DR
Project Name 
Customer Number939-7530
ePlanReviewNo
Description
To construct two story 2326 sq ft single family dwelling. 1481 sq ft first floor and 845 sq ft second floor, with an attached 834 sq ft three car garage. And a 510 sq ft concrete patio. Per approved plans, engineering and attached conditions list. (pc#392) *RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20008/25/20008/25/2000APASS
DetailsRuss Owen
doug ###-#### fn--re-insp --call 1st before insp please---
BLD-Final8/23/20008/24/20008/24/2000AFAIL
DetailsRuss Owen
###-####- DOUG FN left c/n posted.. 8/25/2000 9:46:52 AM
BLD-Framing/Rough-in7/10/20007/10/20007/10/2000PPASS
DetailsRuss Owen
###-####
BLD-Framing/Rough-in7/6/20007/7/20007/7/2000AFAIL
DetailsRuss Owen
###-#### Re-insp. fee C/N stairs. 7/7/00 1:50:43 PM
BLD-Framing/Rough-in7/6/20007/6/20007/6/2000AFAIL
DetailsRuss Owen
C/N stairs, runs.
BLD-Framing/Rough-in7/5/20007/6/20007/6/2000AFAIL
DetailsTony Young
###-#### C/N left 7/7/00 1:27:33 PM
BLD-Energy code compliance6/29/20006/30/20006/30/2000PFAIL
DetailsRuss Owen
c/n posted 7/3/00 9:14:03 AM
BLD-Framing/Rough-in6/29/20006/30/20006/29/2000PFAIL
DetailsRuss Owen
###-#### c/n posted need to complete 7/3/00 9:15:14 AM
BLD-Framing/Rough-in6/29/20006/29/20006/29/2000PFAIL
DetailsRuss Owen
John ###-#### complete c/n 7/3/00 8:38:20 AM
BLD-Framing/Rough-in6/27/20006/27/20006/27/2000AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/27/2000 at 06:53:33. Contact: . complete c/n 6/27/00 2:07:02 PM
BLD-Framing/Rough-in6/26/20006/26/20006/26/2000PCANC
DetailsRuss Owen
Bob ###-####
BLD-Framing/Rough-in6/22/20006/22/20006/22/2000PFAIL
DetailsRuss Owen
John ###-#### c/N posted 6/23/00 11:21:22 AM
BLD-Framing/Rough-in6/19/20006/20/20006/20/2000APART
DetailsRuss Owen
###-#### Ok to side, upper floor shear at interior. 6/21/00 11:37:21 AM
BLD-Framing/Rough-in6/14/20006/15/20006/15/2000AFAIL
DetailsRuss Owen
###-#### shear wall No approved plans 6/15/00 1:43:35 PM
BLD-Framing/Rough-in6/15/20006/15/20006/15/2000PFAIL
DetailsRuss Owen
###-#### shear nail
BLD-Foundation5/23/20005/23/20005/23/2000APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/23/2000 at 06:58:43. Contact: ###-####.
BLD-Footing5/22/20005/22/20005/22/2000PPASS
DetailsRuss Owen
###-####
BLD-Footing5/19/20005/19/20005/19/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/19/2000 at 10:45:23. Contact: ###-####. No approved plans, not ready appears will be ok. 5/22/00 10:43:45 AM