Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-01225
StatusFinaled
Name B & L WOOLF (DWELLING TO OFFICE)
Site Address 3298 N FIVE MILE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Converting an existing 1,907 sq. ft. single family dwelling into a commercial office building per approved plans on file. Work to include providing a new accessible route into building, providing restrooms meeting current accessibility standards, constructing a new covered entry, exterior wall infill portions, some new exterior doors and windows, additional structural support for existing floor (new posts/piers), new interior walls and doors, interior finish, reroofing, new exterior siding and veneer, mechanical work, plumbing work, and electrical work. Reduction of requirements for exterior wall rating because of location on property per Boise City Policy letter "How to Convert a Dwelling to an Office". Work requires Special Inspections. Remodel and site upgrades to be in compliance with CVA00-00004 and DRH00-00080. (P.C.#325-00) JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200111/30/200111/30/2001APASS
DetailsDave Hannah
###-#### ok for perm occ. 11/30/2001 10:52:23 AM
Permanent Occupancy 11/30/200111/30/2001 DONE
Details
Code Occupancy Approval11/29/200111/29/200111/29/2001PPASS
DetailsCarol Montgomery
Added by Inspector: CAM On 11/29/01 2:54:48 PM MEETS COMPLIANCE - FINAL SIGNED
BLD-Final11/5/200111/5/200111/5/2001PFAIL
DetailsDave Hannah
###-#### needs other sign offs 11/5/2001 2:10:40 PM
FIRE-Conference11/1/200111/2/200111/2/2001PPASS
DetailsTroy Cobbley
OK for perm. occ. for the fire/life safety portion 11/5/2001 8:31:03 AM
FIRE-Final Inspection6/27/20016/28/20016/28/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued 6/28/2001 9:20:25 AM
BLD-Energy code compliance4/23/20014/23/20014/23/2001PPASS
DetailsDave Hannah
energy code-- ###-####- barb c/n finshed ok to cover 4/23/2001 2:28:09 PM
BLD-Framing/Rough-in4/18/20014/19/20014/19/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 04/18/2001 at 10:58:55. Contact: ###-####. ok to insulate need mec rought in c/n finished 4/19/2001 2:15:12 PM
BLD-Framing/Rough-in4/17/20014/18/20014/18/2001PCANC
DetailsDave Hannah
Barbara ###-####
BLD-Framing/Rough-in4/17/20014/17/20014/17/2001PNR
DetailsDave Hannah
###-#### CALL FIRST
BLD-Foundation1/2/20011/2/20011/2/2001PNR
DetailsDave Hannah
RE BAR ###-####- JOHNNY
BLD-Conference11/28/200011/29/200011/29/2000APASS
DetailsDave Hannah
for conf-- ###-####-- barbara
BLD-Framing/Rough-in11/24/200011/27/200011/27/2000ANH
DetailsTom Arcoraci
###-#### ###-#### no access or ans on phone 11/27/2000 11:44:25 AM
BLD-Conference11/7/200011/7/200011/7/2000PPASS
DetailsTom Arcoraci
No double fee. Owners have been working on approval no work has been performed since Feb. on structure.