BLD-Final | 11/29/2001 | 11/30/2001 | 11/30/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### ok for perm occ. 11/30/2001 10:52:23 AM
|
Permanent Occupancy | | 11/30/2001 | 11/30/2001 | | DONE |
|
|
|
|
Code Occupancy Approval | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PASS |
Carol Montgomery
|
|
|
Added by Inspector: CAM On 11/29/01 2:54:48 PM MEETS COMPLIANCE - FINAL SIGNED
|
BLD-Final | 11/5/2001 | 11/5/2001 | 11/5/2001 | P | FAIL |
Dave Hannah
|
|
|
###-#### needs other sign offs 11/5/2001 2:10:40 PM
|
FIRE-Conference | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | PASS |
Troy Cobbley
|
|
|
OK for perm. occ. for the fire/life safety portion 11/5/2001 8:31:03 AM
|
FIRE-Final Inspection | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | FAIL |
Joe Tawney
|
|
|
Final Fail C/N issued 6/28/2001 9:20:25 AM
|
BLD-Energy code compliance | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Dave Hannah
|
|
|
energy code-- ###-####- barb c/n finshed ok to cover 4/23/2001 2:28:09 PM
|
BLD-Framing/Rough-in | 4/18/2001 | 4/19/2001 | 4/19/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/18/2001 at 10:58:55. Contact: ###-####. ok to insulate need mec rought in c/n finished 4/19/2001 2:15:12 PM
|
BLD-Framing/Rough-in | 4/17/2001 | 4/18/2001 | 4/18/2001 | P | CANC |
Dave Hannah
|
|
|
Barbara ###-####
|
BLD-Framing/Rough-in | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | NR |
Dave Hannah
|
|
|
###-#### CALL FIRST
|
BLD-Foundation | 1/2/2001 | 1/2/2001 | 1/2/2001 | P | NR |
Dave Hannah
|
|
|
RE BAR ###-####- JOHNNY
|
BLD-Conference | 11/28/2000 | 11/29/2000 | 11/29/2000 | A | PASS |
Dave Hannah
|
|
|
for conf-- ###-####-- barbara
|
BLD-Framing/Rough-in | 11/24/2000 | 11/27/2000 | 11/27/2000 | A | NH |
Tom Arcoraci
|
|
|
###-#### ###-#### no access or ans on phone 11/27/2000 11:44:25 AM
|
BLD-Conference | 11/7/2000 | 11/7/2000 | 11/7/2000 | P | PASS |
Tom Arcoraci
|
|
|
No double fee. Owners have been working on approval no work has been performed since Feb. on structure.
|