Permit Number | BLD00-01233 |
Status | Expired |
Name |
ST LUKES
|
Site Address |
190 E BANNOCK ST
|
Project Name | ST LUKES |
Customer Number | STL980228 |
ePlanReview | No |
Description |
TO CONSTRUCT APPROXIMATELY 100 FEET OF 2-HOUR WALL, FROM FINISH FLOOR TO BOTTOM OF CONCRETE FLOOR ABOVE, BETWEEN THE EXISTING WAITING / TRIAGE ROOM AND THE EXTERIOR EAST WALL TO CREATE A TEMPORARY EXIT PASSAGEWAY EXTENSION TO SERVE THE EAST STAIR ENCLOSURE DURING THE CONSTRUCTION OF A NEW CONCRETE SHELL & CORE EXPANSION AGAINST THE EXISTING EAST HOSPITAL EXTERIOR; TO SEAL JUNCTURE OF 2-HOUR WALL & DECK WITH APPROVED FIRE STOP SYSTEM; TO CUT AN OPENING AND INSTALL A NEW DOOR FROM THE EAST WING, EAST STAIR ENCLOSURE; INSTALL 2, NEW, 90 MINUTE/450 DEGREE LABELED, DOOR ASSEMBLIES, WITH PANIC HARDWARE, AS EXIT DOORS; TO REMOVE EXISTING DUCTWORK AND CAP AT A LOCATION ON THE WEST SIDE OF THE NEW 2 HOUR WALL; CONSTRUCT OTHER MICELLANEOUS NON-COMBUSTIBLE, FIRE-RESISTIVE WALLS; CEILING & WALL FINISHES; SPRINKLER, ALARM, MECHANICAL & ELECTRICAL UPGRADES AND INSTALL A NEW FABRIC COVERED AWNING ON NON-COMBUSTIBLE FRAME AT NEW ENTRY DOORS INSTALLED IN SOUTH WALL; TO REMOVE EXTERIOR WALL GLAZING AND INFILL WITH NON-COMBUSTIBLE FRAMING & SHEETROCK COVER (NOT A RATED CONSTRUCTION AND REMOVE EXISTING EAST SIDE CANOPY AT PREVIOUS EMERGENCY ENTRANCE. ALL PER APPROVED PLANS. NOTE:THIS BUILDING IS FULLY SPRINKLED WITH ALARM SYSTEM. PC#00-324 / drs
|