BLD-Final | 8/30/2000 | 8/31/2000 | 8/31/2000 | A | PASS |
Jim Storey
|
|
|
larry ###-####
|
FIRE-Final Inspection | 8/30/2000 | 8/30/2000 | 8/30/2000 | P | PASS |
Rick Jackson
|
|
|
LARRY -###-#### -FN FIRE -RE-INSP
|
BLD-Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | A | FAIL |
|
|
|
LARRY--###-#### FN OCC need elc signoff 8/29/2000 4:22:01 PM
|
FIRE-Final Inspection | 8/28/2000 | 8/28/2000 | 8/29/2000 | P | FAIL |
Rick Jackson
|
|
|
LARRY -- ###-#### FIRE FN
|
FIRE-Sprinkler Rough-in | 6/6/2000 | 6/7/2000 | 6/7/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 06/06/2000 at 16:15:48. Contact: ###-####. Ok to cover ramp area 6/13/00 3:21:54 PM
|
BLD-Framing/Rough-in | 5/30/2000 | 5/31/2000 | 5/31/2000 | A | PASS |
|
|
|
Larry Cantrell ###-#### made ok to cover the outside of the tunnel 6/1/00 9:15:22 AM
|
BLD-Framing/Rough-in | 5/26/2000 | 5/30/2000 | 5/30/2000 | A | PART |
|
|
|
###-#### OK TOCOVER OUTSIDE OF THE TUNNEL, NEED TO REMOVE TAPING MUD AT PENETRATIONS AND ADD FIRE CAULK AT THE TOP OF THE INSIDE HALL WALL 5/30/00 3:41:45 PM
|