BLD-Final | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | PASS |
Tom Arcoraci
|
|
|
dave-- ###-#### -call 1st before insp fn Ok for perm 7/28/00 11:50:25 AM
|
Permanent Occupancy | | 7/28/2000 | 7/28/2000 | | DONE |
|
|
|
|
BLD-Final | 7/20/2000 | 7/21/2000 | 7/21/2000 | P | FAIL |
Carl Dependahl
|
|
|
Dave ###-####; c/n re occ separation, glazing spec'd, & hvac has c/n; ok for t/o.card left onsite 7/21/2000 10:51:56 AM
|
FIRE-Final Inspection | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | PASS |
Joe Tawney
|
|
|
Dave ###-#### Reinsp ok for perm. occ. 7/21/00 1:03:06 PM
|
BLD-Final | 7/19/2000 | 7/20/2000 | 7/20/2000 | A | FAIL |
Carl Dependahl
|
|
|
Dave ###-#### Need all sig's 7/20/00 2:01:49 PM
|
FIRE-Final Inspection | 7/19/2000 | 7/20/2000 | 7/20/2000 | A | FAIL |
Joe Tawney
|
|
|
Dave ###-#### Final fail door sign, fire ext., ceiling, tile, AHV. 7/20/00 1:21:19 PM
|
BLD-Framing/Rough-in | 6/9/2000 | 6/12/2000 | 6/12/2000 | A | PART |
Jim Sly
|
|
|
Jim ###-####\c\n architect to provide detail for one hour wall to roof connection ok to cover complete per detail.
|