Permit Information
Permit NumberBLD00-01303
StatusFinaled
Name LOMBARD CONRAD ARCHITECTS
Site Address 2081 W COMMERCE AVE
Project NameFOUNDATION
Customer Number 
ePlanReviewNo
Description
BOISE CASCADE NEW AVIATION FACILITY * FOUNDATION\SLAB AND UNDER SLAB UTILITIES ONLY, IN PREPARATION FOR FUTURE CONSTRUCTION OF THE BOISE CASCADE AVIATION FACILITY. NO CONSTRUCTION BEYOND FOUNDATION IS ALLOWED UNDER THIS PERMIT. ALL PER ENGINEERED PLANS ON FILE AS APPROVED BY THE PUBLIC WORKS DEPARTMENT. NO BUILDING TO BE CONSTRUCTED, DEMOLISHED OR INSTALLED UNDER THIS PERMIT. DRH99-00203 PC#340-00 GRADING PERMIT IS UNDER BLD00-00986 WHICH WAS ISSUED 4/13/2000 KMM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/18/2003 DONE
BLD-Final3/7/20013/7/20013/7/2001APASS
DetailsJim Storey
Added by Inspector: 301 On 3/7/2001 9:38:35 AM l/c isued on site ok.
BLD-Foundation6/16/20006/19/20006/19/2000PPART
DetailsJim Storey
###-####
BLD-Foundation6/14/20006/14/20006/14/2000PPART
DetailsJim Storey
bruce ###-#### foundation wall
BLD-Footing6/12/20006/13/20006/13/2000PPART
DetailsJim Storey
Bruce ###-####
BLD-Foundation6/5/20006/7/20006/7/2000PPASS
DetailsJim Storey
Bruce ###-####
BLD-Footing6/5/20006/6/20006/6/2000PPART
DetailsJim Storey
Bruce ###-#### pending special insp. report / engineer of record to address bolt cut threads for vaule loss. 6/6/00 3:54:54 PM
BLD-Foundation5/30/20006/1/20006/1/2000PPART
DetailsJim Storey
###-####
BLD-Footing5/30/20005/31/20005/31/2000PPART
DetailsJim Storey
###-####
BLD-Footing5/23/20005/24/20005/24/2000APART
DetailsJim Storey
Bruice ###-#### pending speciarebar ok. 5/24/00 9:01:21 AM
BLD-Footing5/19/20005/22/20005/22/2000PPART
DetailsJim Storey
###-#### Pending report from strata special insp. 5/23/00 2:32:16 PM
BLD-Footing5/18/20005/19/20005/19/2000APART
Details
###-#### poured w/o 338 insp pending sp insp approvals 5/19/00 11:25:52 AM
BLD-Footing5/16/20005/17/20005/17/2000APART
DetailsJim Storey
bruce--###-#### ft pending report 5/24/00 9:03:07 AM
BLD-Footing5/12/20005/15/20005/15/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/12/2000 at 15:01:47. Contact: .
BLD-Footing5/12/20005/15/20005/15/2000APART
DetailsJim Storey
bill-- ###-#### ft
BLD-Footing5/11/20005/12/20005/12/2000PNR
Details
Scheduled by a contractor via Hello! on 05/11/2000 at 16:45:50. Contact: ###-####. grid line 1-a/g grid line A-1/8 need to check the earth to steel clearance at the earth neat line at g line 1 at g/f 5/12/00 3:04:14 PM