BLD-Final | 8/8/2000 | 8/8/2000 | 8/8/2000 | P | PASS |
Jim Sly
|
|
|
Travis Perry ###-####
|
BLD-Energy code compliance | 6/12/2000 | 6/13/2000 | 6/13/2000 | A | PASS |
Jim Sly
|
|
|
mike ###-#### Frame pass 6/13/00 2:41:21 PM
|
BLD-Framing/Rough-in | 6/8/2000 | 6/9/2000 | 6/9/2000 | P | PASS |
Jim Sly
|
|
|
mike ###-#### spot check air at energy inspection
|
BLD-Framing/Rough-in | 6/2/2000 | 6/5/2000 | 6/5/2000 | A | PART |
Jim Sly
|
|
|
###-####-mike shear wall insp Shear ok 6/6/00 11:37:08 AM C/N retro fit HD's 6/6/00 11:37:16 AM
|
BLD-Footing | 5/18/2000 | 5/19/2000 | 5/19/2000 | A | FAIL |
Jim Sly
|
|
|
travis --###-#### ft Early start- foot appears ok. 5/22/00 10:57:53 AM
|