BLD-Final | 10/6/2000 | 10/6/2000 | 10/6/2000 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/06/2000 at 10:10:22. Contact: ###-####.
|
BLD-Final | 10/4/2000 | 10/4/2000 | 10/4/2000 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 11:07:45. Contact: ###-####.
|
BLD-Energy code compliance | 8/1/2000 | 8/1/2000 | 8/1/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/01/2000 at 09:20:32. Contact: ###-####. Will require r-19 floor insulation. 8/2/2000 8:56:23 AM
|
BLD-Energy code compliance | 7/28/2000 | 7/31/2000 | 7/31/2000 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/28/2000 at 13:39:16. Contact: ###-####. wattson meccheck road 8/1/00 4:47:22 PM
|
BLD-Framing/Rough-in | 7/24/2000 | 7/26/2000 | 7/26/2000 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 15:02:52. Contact: ###-####. C/N posted (working on) ok to insulate re-check frame at energy code 7/27/00 10:40:51 AM
|
BLD-Wall cover | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/11/2000 at 07:57:47. Contact: ###-####.
|
BLD-Footing | 5/24/2000 | 5/25/2000 | 5/25/2000 | P | PART |
Russ Owen
|
|
|
rob ###-#### early start okay Early start 5/31/00 9:13:55 AM
|
BLD-Conference | 5/22/2000 | 5/22/2000 | 5/22/2000 | A | PASS |
|
|
|
Added by Inspector: 338 On 5/22/00 n the ass y of tunnell gae ok to double p 3/5 " studs for the tunnel ceiling all are 20 guage. ok to log cabin the entry area to the rated wall on the entry side
|