BLD-Final | 11/16/2000 | 11/17/2000 | 11/17/2000 | A | CANC |
Steven Webb
|
|
|
###-####: Cancelled by contractor, will re-schedule for pm. 11/17/2000 9:52:56 AM
|
BLD-Final | 11/17/2000 | 11/17/2000 | 11/17/2000 | P | PART |
Jim Sly
|
|
|
###-#### OK for temp Occ..Need signature for perm Occ.from ACHD....... 11/17/2000 2:45:42 PM
|
BLD-Final | 11/16/2000 | 11/16/2000 | 11/16/2000 | P | FAIL |
Jim Sly
|
|
|
JIM ###-#### FN INSP Need ACHD signature....... 11/16/2000 4:22:34 PM
|
FIRE-Final Inspection | 11/14/2000 | 11/15/2000 | 11/15/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### Reinsp Fail Flow alarm, Breaker lock, signs 11/15/2000 12:17:35 PM
|
BLD-Final | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | NR |
Jim Sly
|
|
|
Jim ###-#### Need all signatures and letter form Eng. 11/14/2000 4:58:21 PM
|
FIRE-Final Inspection | 11/13/2000 | 11/14/2000 | 11/14/2000 | A | FAIL |
Joe Tawney
|
|
|
jim ###-#### Final Fail Spklr system & Monitoring, Fire hyd 11/14/2000 12:26:25 PM
|
BLD-Framing/Rough-in | 9/18/2000 | 9/20/2000 | 9/20/2000 | A | PART |
Jim Sly
|
|
|
jim ###-#### welding insp welding OK pending special inspection s and approvals. 9/20/2000 8:17:19 AM
|
BLD-Concrete | 8/1/2000 | 8/2/2000 | 8/2/2000 | A | PART |
Jim Sly
|
|
|
###-#### (North wall) footing appears OK pending special insp tests and approvals 8/2/2000 8:17:17 AM
|
BLD-Foundation | 7/26/2000 | 7/27/2000 | 7/27/2000 | A | PART |
|
|
|
re-bar Jim ###-#### panels 1-11 ok with sp insp approvals 7/27/2000 11:46:24 AM
|
FIRE-Supply Line Cover | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 07/13/2000 at 14:22:53. Contact: ###-####. OK on supply line cover. 7/14/00 2:44:45 PM
|
BLD-Footing | 7/3/2000 | 7/5/2000 | 7/5/2000 | A | CANC |
Dixie Fellows
|
|
|
jim ###-####...tom will do this 7/5/00 8:27:50 AM
|
BLD-Footing | 7/5/2000 | 7/5/2000 | 7/5/2000 | A | PART |
Tom Arcoraci
|
|
|
spec insp on site
|