BLD-Final | 8/3/2000 | 8/3/2000 | 8/3/2000 | P | PASS |
Carl Dependahl
|
|
|
john--lock box for front door ---bbi ###-#### fn
|
BLD-Final | 8/2/2000 | 8/2/2000 | 8/2/2000 | P | FAIL |
Tom Arcoraci
|
|
|
no access
8/2/2000 4:33:13 PM
|
BLD-Energy code compliance | 6/26/2000 | 6/28/2000 | 6/28/2000 | P | PASS |
Tom Arcoraci
|
|
|
###-#### framing ok 6/29/00 10:06:11 AM
|
BLD-Framing/Rough-in | 6/28/2000 | 6/28/2000 | 6/28/2000 | A | PART |
Carl Dependahl
|
|
|
C/N: mec check, ok to insul per mec check
|
BLD-Framing/Rough-in | 6/28/2000 | 6/28/2000 | 6/28/2000 | A | FAIL |
Carl Dependahl
|
|
|
C/N: complete firestopping, need phase I eng'Rs report, etc.
|
BLD-Final | 6/26/2000 | 6/27/2000 | 6/27/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-#### called in error? 6/28/00 2:26:38 PM
|
BLD-Framing/Rough-in | 6/20/2000 | 6/21/2000 | 6/21/2000 | A | PART |
Carl Dependahl
|
|
|
SHEAR WALL JOHN ###-#### Ok to side 6/22/00 9:36:06 AM
|
BLD-Footing | 6/6/2000 | 6/6/2000 | 6/6/2000 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/06/2000 at 06:55:18. Contact: ###-####.
|
BLD-Footing | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PART |
Carl Dependahl
|
|
|
eric ###-#### Eng'd plans 6/6/00 11:46:39 AM
|