BLD-Final | 9/29/2000 | 10/2/2000 | 10/2/2000 | A | PASS |
Alan Hauser
|
|
|
c/c#19837 10/2/2000 12:09:01 PM
|
BLD-Final | 9/28/2000 | 9/29/2000 | 9/29/2000 | A | FAIL |
Jim Sly
|
|
|
###-####
|
BLD-Energy code compliance | 7/27/2000 | 7/27/2000 | 7/27/2000 | P | PASS |
Jim Sly
|
|
|
###-#### frame pass 7/27/00 2:13:46 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/25/2000 | 7/25/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N...Fireblk F/P, seal deck at tub. 7/25/00 1:41:37 PM
|
BLD-Framing/Rough-in | 6/22/2000 | 6/23/2000 | 6/23/2000 | A | PART |
Jim Sly
|
|
|
Wayne Parl ###-#### Shear nail OK..C/N Missed HDs at gar. 6/23/00 12:15:06 PM
|
BLD-Foundation | 5/25/2000 | 5/25/2000 | 5/25/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### Early start wall- rebar installed in front & rear walls. 5/26/00 12:17:42 PM
|
BLD-Footing | 5/24/2000 | 5/24/2000 | 5/24/2000 | P | FAIL |
Jim Sly
|
|
|
###-#### early pm Early start foot- soil, rebar, ok. 5/25/00 9:11:50 AM
|